Pilgrim 1 — Decommissioned Reactor Data & History

Operational history, outage history & performance charts, scram history, capacity factor & statistics, community ratings, technical specifications, NRC licensing data, photos, nearby jobs, satellite map, contact information, and per diem rates for Pilgrim 1.

Decommissioned

Permanently shut down on 2019-05-31. View Outage History →
?
Current reactor power level from the most recent NRC daily report.
Shut Down
?
Days of continuous operation since the last outage ended. Ranked against all operating units.
2,416
Current Run
days
?
Longest recorded period of continuous operation between outages.
2,416
Record Run
days
?
Breaker-to-Breaker: times this unit ran from one refueling outage to the next with zero forced outages or scrams in between. Ranked among active units.
--
B2B Runs
?
Lifetime capacity factor: average power level across all recorded days (100% = always at full power). Ranked against all NRC-tracked units.
88.9%
Capacity Factor
?
Community rating score (Bayesian-adjusted). Based on 64 votes. Ranked against all rated facilities.
47.6
Rating
64 votes
#76 of 97
Bottom Quartile
?
Total NRC-reported scram events (emergency reactor shutdowns). Ranked fleet-wide — fewer scrams = better rank.
13
Scrams
?
Years since commercial operation began.
46.5
Operating Age
years

Outage Duration Trend

?
Scheduled refueling outage durations over time. Green bars are below average, yellow near average, red above. Dashed line shows the plant's historical average. Shorter outages mean better execution.

Outage Days by Year

?
Total days spent in outage each year, split by scheduled refueling (blue) and forced/unplanned (red). Lower totals indicate better reliability and outage execution. Hover for details.

Facility Statistics

?
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
Lifecycle & Tenure
Operating Age: 46.5 Yrs
Build Time: 4.3 Yrs
Lic. Remaining: N/A Yrs
Production & Power
Lifetime CF: 88.9%
Efficiency: 34.3%
Generated: 110.2 TWh
Reliability & Outages
Record Run: 2,416 Days
Refuelings: 11

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
600 Rocky Hill Road
Plymouth, MA 02360, USA
Get Directions
Phone: (508) 830-8000

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from GSA for FY 2026.
$126
Lodging/Night
$80
M&IE/Day
$206
Total/Day
Plymouth / Taunton / New Bedford, Plymouth / Bristol County, MA

Ownership & Construction

?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Owner/Operator: Holtec International
Architect Engineer: BECH
Constructor: BECH

Technical Specs

?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Reactor Type: BWR
Containment: BWR-MARK 1
NSS Supplier: GE 3
Thermal Power: 1998 MWt
Net Capacity: 685 MWe
Efficiency: 34.3%

Licensing

?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #: 05000293
License #: DPR-35
License Type: OL-FP
Const. Permit: 1968-08-26
Operating Lic: 1972-09-15
Commercial Op: 1972-12-01