UPF uh-oh
http://knoxblogs.com/atomiccity/2016/03/28/upf-uh-oh/
An error like this might be embarrassing at most sites but stormwater drains at Y-12 have a different importance.
from the article:
...Y-12’s managing contractor convened a meeting of the Operational Safety Board to authorize emergency work “to allow expedited modifications to the storm drain and stabilize the construction site in advance of pending storms.”ya know, about 40 years ago or more the PM would have walked over at 4PM, surveyed the gaping hole of a mistake and then turned to the General foremen and rebuked, "I want that dam thing fixed before I get into the office tomorrow morning!!!!"
and,..
it would have been fixed,...
and the cumulative salary costs of a dozen members of the OSB authorizing emergency work would have never been spent,...
sometimes people wonder why everything costs so much and takes so long,...
...Even though the UPF project office has a site representative to ensure “configuration control” of Y-12 systems is maintained during work on the project, it took several days for the error to be recognized and several more days for the Corps of Engineers to inform the Y-12 contractor and the UPF project office....I do not wonder,...
I weep for the future,...