Ratings
Oconee
- Above Average
- 0 (0%)
- Average
- 1 (100%)
- Below Average
- 0 (0%)
Per Diem Data
Facility Statistics
Lifecycle & Tenure
Operating Age: 52.7 Yrs
Build Time: 5.7 Yrs
Lic. Remaining: 6.9 Yrs
Production & Power
Lifetime CF: 90.8%
Efficiency: 32.5%
Generated: 183.2 TWh
Reliability & Outages
Record Run: 936 Days
Refuelings: 16
Ownership & Construction
Technical Specs
Reactor Type:
PWR
Containment:
PWR-DRYAMB
NSS Supplier:
B&W LLP
Thermal Power:
2610 MWt
Net Capacity:
847 MWe
Efficiency:
32.5%
Status:
Operating
Licensing
Docket #:
05000269
License #:
DPR-38
License Type:
OL-FP
Const. Permit:
1967-11-06
Operating Lic:
1973-02-06
Commercial Op:
1973-07-15
License Renewed:
2000-05-23
License Exp:
2033-02-06
Facility Map
34.7912, -82.892