NukeWorker Menu

Robinson 2 - Plant Information & Status

Technical specifications, contact data, ratings, and licensing history for the H.B. Robinson facility.

Capacity Factor (365-Day)

100%
Current
99.5%
365-Day Avg
#26
of 94 plants
Min: 17% Max: 100% 2 days <80%

Ratings

HB Robinson
Above Average
3 (12%)
Average
10 (41%)
Below Average
11 (45%)
Total Members Voted: 10

Facility Statistics

Lifecycle & Tenure
Operating Age: 55.1 Yrs
Build Time: 3.9 Yrs
Lic. Remaining: 4.3 Yrs
Production & Power
Lifetime CF: 89.6%
Efficiency: 32.4%
Generated: 162.4 TWh
Reliability & Outages
Record Run: 714 Days
Refuelings: 16

Scram History 8 events since 2011

8
Total
8
Automatic
0
Manual
2.5
Avg Recovery (days)
Recent Events
2023-06-21 Auto EN Revision Imported Date: 6/27/2023 EN Revision Text: AUTOM...
2019-08-10 Auto AUTOMATIC REACTOR TRIP DUE TO TURBINE TRIP "At 0840 EDT, on ...
2016-10-07 Auto UNUSUAL EVENT DECLARED DUE TO LOSS OF OFFSITE POWER "UE SU1....
2016-08-23 Auto REACTOR TRIP DUE AUTOMATIC TURBINE TRIP FROM 100 PERCENT POW...
2014-01-08 Auto AUTOMATIC REACTOR TRIP DUE TO TURBINE TRIP "At 2234 hours ES...
2013-11-04 Auto AUTOMATIC REACTOR TRIP DUE TO MOMENTARY LOSS OF 4 KV BUSES A...
2012-03-27 Auto AUTOMATIC REACTOR TRIP DUE TO STEAM GENERATOR HIGH WATER LEV...
2011-09-25 Auto AUTOMATIC REACTOR TRIP DUE TO ONE LOOP LOW FLOW SIGNAL "At 1...

Ownership & Construction

Owner/Operator: Duke Energy
Architect Engineer: EBSO
Constructor: EBSO

Technical Specs

Reactor Type: PWR
Containment: PWR-DRYAMB
NSS Supplier: WEST 3LP
Thermal Power: 2339 MWt
Net Capacity: 759 MWe
Efficiency: 32.4%
Status: Operating

Licensing

Docket #: 05000261
License #: DPR-23
License Type: OL-FP
Const. Permit: 1967-04-13
Operating Lic: 1970-07-31
Commercial Op: 1971-03-07
License Renewed: 2004-04-19
License Exp: 2030-07-31

Facility Map

34.4014, -80.1578

Location & Contact

Address:
3581 West Entrance Road
Hartsville, SC 29550, USA
Get Directions
Phone: (803) 857-1000