Help | Contact Us
NukeWorker Logo
NukeWorker Logo
NukeWorker.com
NukeWorker Menu

Nuclear Pictures

NukeWorker online photo album.

Silos 1 and 2 Project
Remove 8,900 cubic yards of high activity low-level waste from two concrete silos. Chemically stabilize waste and ship off site for disposal.
Keywords: Fernald Closure Project Fernald Green Salt Plant, Feed Materials Production Center, Fernald, Ohio (FEMP)

Silos 1 and 2 Project

Remove 8,900 cubic yards of high activity low-level waste from two concrete silos. Chemically stabilize waste and ship off site for disposal.

pict71.jpg 2012983.jpg 10550161_564688670319737_5874053698125413968_o.jpg 885815_313137722141501_2072757534_o.jpg 883735_326850367436903_1116168194_o.jpg
File information
Filename:Silos 1 and 2 Project.jpg
Album name:Rennhack / Fernald (FEMP)
Keywords:Fernald / Closure / Project / Fernald / Green / Salt / Plant, / Feed / Materials / Production / Center, / Fernald, / Ohio / (FEMP)
Credits:DOE Photo
Filesize:624 KiB
Date added:Mar 13, 2005
Dimensions:900 x 600 pixels
Displayed:925 times
Resolution Unit:Inch
Y Resolution:150 dots per ResolutionUnit
URL:https://www.nukeworker.com/pictures/displayimage.php?pid=2831
Favorites:Add to Favorites

NukeWorker ™ is a registered trademark of NukeWorker.com ™, LLC © 1996-2025 All rights reserved.
All material on this Web Site, including text, photographs, graphics, code and/or software, are protected by international copyright/trademark laws and treaties. Unauthorized use is not permitted. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute, in any manner, the material on this web site or any portion of it. Doing so will result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law.
Privacy Statement | Terms of Use | Code of Conduct | Spam Policy | Advertising Info | Contact Us | Forum Rules | Password Problem?