NukeWorker.com: Nuclear Jobs, Resumes, Outage Schedules, & RCT Training

NukeWorker Menu

Last viewed - Smolensk

Smolensk
Smolensk NPP has three operational units with RBMK-1000 type reactors. The initial design called for the construction of two stages. Each stage would have to include two power units with common auxiliary buildings and systems. However the construction of Unit 4 was stopped in 1986 and the second stage remained incomplete.
Keywords: Smolensk
Filename rzm.jpg
Album name Russa
Rating (8 votes) 55555
Keywords Smolensk
Filesize 58 KiB
Date added Jun 18, 2004
Dimensions 301 x 500 pixels
Displayed 2571 times
Favorites Add to Favorites