Help | Contact Us
NukeWorker.com
NukeWorker Menu

Nuclear Pictures

NukeWorker online photo album.

Ling Ao
Operator: Ling Ao Nuclear Power Co Ltd
Configuration: 2 X 990 MW PWR
Operation: 2002-2003
Reactor supplier: Framatome
T/G supplier: Alstom
EPC: CNNC, Shandong No 1 Electric Power Construction Engineering Co
Quick facts: Units 1&2 went commercial 48 and 66 days ahead of schedule, respectively

Ling Ao

Operator: Ling Ao Nuclear Power Co Ltd
Configuration: 2 X 990 MW PWR
Operation: 2002-2003
Reactor supplier: Framatome
T/G supplier: Alstom
EPC: CNNC, Shandong No 1 Electric Power Construction Engineering Co
Quick facts: Units 1&2 went commercial 48 and 66 days ahead of schedule, respectively

tianwan.jpg guangdong_nuclear_power_station.jpg lingao.jpg daya-bay.jpg Shika.jpg
File information
Filename:lingao.jpg
Album name:Rennhack / China
Rating (1 votes):33333
Credits:Ministere des Affaires Etrangeres (FR)
Filesize:65 KiB
Date added:Mar 11, 2005
Dimensions:300 x 220 pixels
Displayed:1034 times
URL:https://www.nukeworker.com/pictures/displayimage.php?pid=2710
Favorites:Add to Favorites


NukeWorker ™ is a registered trademark of NukeWorker.com ™, LLC © 1996-2024 All rights reserved.
All material on this Web Site, including text, photographs, graphics, code and/or software, are protected by international copyright/trademark laws and treaties. Unauthorized use is not permitted. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute, in any manner, the material on this web site or any portion of it. Doing so will result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law.
Privacy Statement | Terms of Use | Code of Conduct | Spam Policy | Advertising Info | Contact Us | Forum Rules | Password Problem?