NukeWorker.com: Nuclear Jobs, Resumes, Outage Schedules, & RCT Training

NukeWorker Menu

Last viewed - Analytical Lab Decontamination and Demolition Project - An Operating Engineer uses Grapplers to Segregate Demolition Debris that Needs Further Size Reducing from that which can be Immediately Loaded for Transfer to the On-Site Disposal Facility (OSDF).

Analytical Lab Decontamination and Demolition Project - An Operating Engineer uses Grapplers to Segregate Demolition Debris that Needs Further Size Reducing from that which can be Immediately Loaded for Transfer to the On-Site Disposal Facility (OSDF).
The Analytical Laboratory housed the analytical, metallugical and chemical process laboratories and was divided into restricted and non-restricted areas. During Fernald's production era the facility was used to verify the uranium product quality. The laboratory used state of the art technology and various chemicals during the preparation and determination of the analytical result. More recently, the laboratory staff processed various samples associated with cleanup. The D&D of the Lab consists of asbestos abatement, building and equipment dismantlement, size reduction of building material and loading for transfer to the On-Site Disposal Facility. 
Keywords: Fernald Closure Project Fernald Green Salt Plant, Feed Materials Production Center, Fernald, Ohio (FEMP)
Filename fernald_DnD_14.jpg
Album name Rennhack / Fernald (FEMP)
Date Feb-29-2004
Credits DOE Photo
Filesize 50 KiB
Date added Oct 30, 2005
Dimensions 288 x 192 pixels
Displayed 1127 times
Favorites Add to Favorites