NukeWorker.com: Nuclear Jobs, Resumes, Outage Schedules, & RCT Training

NukeWorker Menu

Other Services

Outage Schedules Gold Member Study Guides Upload Picture View Pictures Calendar Quiz Help Search for User

Nuclear Pictures

NukeWorker online photo album.

AP1000 Design
The AP1000 utilizes modularization technique for construction, which allows many construction activities to proceed in parallel. This technique reduces the plant construction calendar time, which saves the IDC (Interest During Construction) cost and reduces the risks associated with plant financing. The AP1000 has a site construction schedule of 36 months from first concrete to fuel loading. 
Keywords: AP1000

AP1000 Design

The AP1000 utilizes modularization technique for construction, which allows many construction activities to proceed in parallel. This technique reduces the plant construction calendar time, which saves the IDC (Interest During Construction) cost and reduces the risks associated with plant financing. The AP1000 has a site construction schedule of 36 months from first concrete to fuel loading.

AP1000Reactor.jpg A.jpg A1.jpg G6.jpg Riverbend.jpg
File information
Filename:A1.jpg
Album name:Rennhack / AP1000 APWR
Rating (2 votes):44444
Keywords:AP1000
Filesize:27 KiB
Date added:Jul 19, 2006
Dimensions:300 x 377 pixels
Displayed:2593 times
URL:https://www.nukeworker.com/pictures/displayimage.php?pid=5293
Favorites:Add to Favorites