Help | Contact Us
NukeWorker.com
NukeWorker Menu

Nuclear Pictures

NukeWorker online photo album.

Princeton Plasma Physic Laboratory Site Map
The Princeton Plasma Physic Laboratory is located on 36 hectares (88.5 acres) of property leased from Princeton University on the James Forrestal Campus, in Plainsboro Township, Middlesex County, New Jersey. The primary mission of the site is to conduct magnetic confinement plasma physics research and investigates the possible application of fusion power as an energy source. Historically, the lab was involved in fusion energy programs sponsored by the US Department of Energy (DOE). Past activities contaminated the soil and groundwater with petroleum, hydrocarbons and solvents. Some of the metal contaminated soil was disposed of at a commercial facility permitted to accept hazardous waste. The rest of the soil was removed and disposed of offsite. Surface waters from building sump pumps are discharged into a lined stormwater detention basin, which discharges into a nearby brook. The discharge to the brook is monitored in compliance with a State of New Jersey surface water discharge permit. Long-term stewardship activities include the monitoring of groundwater to prevent contaminants from migrating offsite. Remediation was completed in FY 1999.

Princeton Plasma Physic Laboratory Site Map

The Princeton Plasma Physic Laboratory is located on 36 hectares (88.5 acres) of property leased from Princeton University on the James Forrestal Campus, in Plainsboro Township, Middlesex County, New Jersey. The primary mission of the site is to conduct magnetic confinement plasma physics research and investigates the possible application of fusion power as an energy source. Historically, the lab was involved in fusion energy programs sponsored by the US Department of Energy (DOE). Past activities contaminated the soil and groundwater with petroleum, hydrocarbons and solvents. Some of the metal contaminated soil was disposed of at a commercial facility permitted to accept hazardous waste. The rest of the soil was removed and disposed of offsite. Surface waters from building sump pumps are discharged into a lined stormwater detention basin, which discharges into a nearby brook. The discharge to the brook is monitored in compliance with a State of New Jersey surface water discharge permit. Long-term stewardship activities include the monitoring of groundwater to prevent contaminants from migrating offsite. Remediation was completed in FY 1999.

wrgc2.gif pppl1.gif pppl2.gif middlesexnorth_map.jpg misp1.gif
File information
Filename:pppl2.gif
Album name:Rennhack / Princeton Plasma Physics Lab (PPPL)
Filesize:22 KiB
Date added:Mar 22, 2009
Dimensions:319 x 417 pixels
Displayed:412 times
URL:https://www.nukeworker.com/pictures/displayimage.php?pid=7463
Favorites:Add to Favorites


NukeWorker ™ is a registered trademark of NukeWorker.com ™, LLC © 1996-2024 All rights reserved.
All material on this Web Site, including text, photographs, graphics, code and/or software, are protected by international copyright/trademark laws and treaties. Unauthorized use is not permitted. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute, in any manner, the material on this web site or any portion of it. Doing so will result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law.
Privacy Statement | Terms of Use | Code of Conduct | Spam Policy | Advertising Info | Contact Us | Forum Rules | Password Problem?