NukeWorker.com: Nuclear Jobs, Resumes, Outage Schedules, & RCT Training

NukeWorker Menu

Other Services

Outage Schedules Gold Member Study Guides Upload Picture View Pictures Calendar Quiz Help Search for User

Nuclear Pictures

NukeWorker online photo album.

Two Crews Work to Remove Waste Material from Pit 2.
The Waste Pits Remedial Action Project (WPRAP) involves the remediation of six waste pits, the Burn Pit, the Clearwell, miscellaneous structures, facilities, and soil. More than 1 million tons of contaminated materials are associated with the cleanup project. The Shaw Group, formerly IT Corporation, constructed the remediation facilities for the project, which include a Material Handling Building, where excavated wastes from the pit area will be sorted, blended and treated, Gas Control System/ Water Treatment System (GCS/WTS) Building, and the Railcar Loadout Building, where material is loaded into railcars for shipment to Envirocare of Utah.
Keywords: Fernald Closure Project Fernald Green Salt Plant, Feed Materials Production Center, Fernald, Ohio (FEMP)

Two Crews Work to Remove Waste Material from Pit 2.

The Waste Pits Remedial Action Project (WPRAP) involves the remediation of six waste pits, the Burn Pit, the Clearwell, miscellaneous structures, facilities, and soil. More than 1 million tons of contaminated materials are associated with the cleanup project. The Shaw Group, formerly IT Corporation, constructed the remediation facilities for the project, which include a Material Handling Building, where excavated wastes from the pit area will be sorted, blended and treated, Gas Control System/ Water Treatment System (GCS/WTS) Building, and the Railcar Loadout Building, where material is loaded into railcars for shipment to Envirocare of Utah.

IMG_0260.jpg 466657_336051539850119_499298369_o.jpg _0011.jpg DSC02041.jpg DSC02863.jpg
File information
Filename:fernald_cells_3.jpg
Album name:Rennhack / Fernald (FEMP)
Keywords:Fernald / Closure / Project / Fernald / Green / Salt / Plant, / Feed / Materials / Production / Center, / Fernald, / Ohio / (FEMP)
Date:Mar-31-2004
Credits:DOE Photo
Filesize:56 KiB
Date added:Oct 30, 2005
Dimensions:288 x 192 pixels
Displayed:1030 times
URL:https://www.nukeworker.com/pictures/displayimage.php?pid=3981
Favorites:Add to Favorites