NukeWorker.com: Nuclear Jobs, Resumes, Outage Schedules, & RCT Training

NukeWorker Menu

Most viewed - Plants 2 and 3 Decontamination and Demolition Project - An Operating Engineer Uses a Shear to Size Reduce the Bulk Lime Handling Building.

Plants 2 and 3 Decontamination and Demolition Project - An Operating Engineer Uses a Shear to Size Reduce the Bulk Lime Handling Building.
Plants 2 and 3, the Ore Refinery Plants, were used to convert feed materials and recycled scrap to high purity uranium trioxide (UO3). Three processes were used during the conversion: digestion, where uranium was converted to soluble uranyl nitrate; extraction, where uranyl nitrate was extracted by a solvent mixture; and denitration, where high purity uranyl nitrate was converted to UO3. The D&D of the plants consists of surface decontamination, building and equipment dismantlement, size reduction of building material and the loading of demolition debris into rolloff boxes for transfer to the On-Site Disposal Facility. 
Keywords: Fernald Closure Project Fernald Green Salt Plant, Feed Materials Production Center, Fernald, Ohio (FEMP)
Filename 2012965.jpg
Album name Rennhack / Fernald (FEMP)
Date Jan-31-2004
Credits DOE Photo
Filesize 70 KiB
Date added Oct 30, 2005
Dimensions 233 x 350 pixels
Displayed 1079 times
Favorites Add to Favorites