Most viewed - Workers Remove Transite Panels from the Pilot Plant in Preparation for the Demolition of the Concrete Structure.

Workers Remove Transite Panels from the Pilot Plant in Preparation for the Demolition of the Concrete Structure.
The Pilot Plant was the first plant to go on line at Fernald. The plant served as an operating prototype for all phases of the uranium metal production process and a training area for new operators. Later, the plant's main function became the conversion of uranium hexaflouride (UF6) to uranium tetraflouride (UF4), called green salt, for use in the metal production process. Workers also purified thorium and converted thorium nitrate to thoria gel oxides in the plant. The D&D of the plants consists of surface decontamination, building and equipment dismantlement, size reduction of building material and the loading of demolition debris into rolloff boxes for transfer to the On-Site Disposal Facility. 
Keywords: Fernald Closure Project Fernald Green Salt Plant, Feed Materials Production Center, Fernald, Ohio (FEMP)
Filename fernald_DnD_4.jpg
Album name Rennhack / Fernald (FEMP)
Date Apr-30-2004
Credits DOE Photo
Filesize 52 KiB
Date added Oct 30, 2005
Dimensions 288 x 192 pixels
Displayed 1628 times