NukeWorker.com: Nuclear Jobs, Resumes, Outage Schedules, & RCT Training

NukeWorker Menu

Most viewed - The Bio-Dentrification Tower and Plants 2 and 3 After Demolition. Excavation Crews are Now Removing the Below-Grade Portions of the Structures.

The Bio-Dentrification Tower and Plants 2 and 3 After Demolition. Excavation Crews are Now Removing the Below-Grade Portions of the Structures.
Plants 2 and 3, the Ore Refinery Plants, were used to convert feed materials and recycled scrap to high purity uranium trioxide (UO3). Three processes were used during the conversion: digestion, where uranium was converted to soluble uranyl nitrate; extraction, where uranyl nitrate was extracted by a solvent mixture; and denitration, where high purity uranyl nitrate was converted to UO3. The D&D of the plants consists of surface decontamination, building and equipment dismantlement, size reduction of building material and the loading of demolition debris into rolloff boxes for transfer to the On-Site Disposal Facility. 
Keywords: Fernald Closure Project Fernald Green Salt Plant, Feed Materials Production Center, Fernald, Ohio (FEMP)
Filename fernald_DnD_5.jpg
Album name Rennhack / Fernald (FEMP)
Rating (1 votes) 22222
Date Mar-31-2004
Credits DOE Photo
Filesize 40 KiB
Date added Oct 30, 2005
Dimensions 288 x 192 pixels
Displayed 1081 times
Favorites Add to Favorites