Workers Finish Installing a Bridge Crane in the Silos 1 and 2 Treatment Facility that will be used to Load the Waste Containers for Transportation Off Site.1221 viewsMay 02, 2026 at 06:53 PM
A Member of the Quality Assurance Group Watches as a Worker Installs a HEPA Filter at Silo 3.1402 viewsMay 02, 2026 at 06:53 PM
Operating Engineers Cover Demolition Debris from the Analytical Laboratory with Impacted Soil in Cell 4 of the On-Site Disposal Facility.1230 viewsMay 02, 2026 at 06:07 PM
An Electrician Verifies that One of the Motor Controls that will Operate a Piece of Equipment in the Silos 1 and 2 Treatment Facility Works Correctly.1230 viewsMay 02, 2026 at 06:07 PM
A Supervisor and a Member of the Site's Waste Acceptance Organization Watch as Operating Engineers Shear a Section of the Analytical Lab.1324 viewsMay 02, 2026 at 06:07 PM
The Bio-Dentrification Tower and Plants 2 and 3 Prior to Demolition.1194 viewsMay 02, 2026 at 06:07 PM
Workers are Trained to Seal the Soft-Sided Packages that will be used for the Silo 3 Waste.1287 viewsMay 02, 2026 at 06:07 PM
Operating Engineers Topple the Last Section of Plant 8 by Pushing the Structure to the Ground.1232 viewsMay 02, 2026 at 06:07 PM
An Operating Engineer Loads Building Debris into an Articulation Dump Truck on the Pad of the Lab Building.1192 viewsMay 02, 2026 at 06:07 PM
Operating Engineers use Grapplers and Bulldozers to Place and Compact Demolition Debris in Cell 4 of the On-Site Disposal Facility (OSDF).1306 viewsMay 02, 2026 at 06:07 PM
Analytical Lab Decontamination and Demolition Project - An Operating Engineer uses Grapplers to Segregate Demolition Debris that Needs Further Size Reducing from that which can be Immediately Loaded for Transfer to the On-Site Disposal Facility (OSDF).1273 viewsMay 02, 2026 at 06:07 PM
Workers Remove Process Piping in the Pilot Plant as Part of the Demolition Process.1350 viewsMay 02, 2026 at 06:07 PM
Electricians Install Various Sizes of Conduit in the Electrical Room.1347 viewsMay 02, 2026 at 06:07 PM