Workers Remove Transite Panels from the Pilot Plant in Preparation for the Demolition of the Concrete Structure.1722 viewsMay 02, 2026 at 06:07 PM
Plants 2 and 3 Decontamination and Demolition Project - An Operating Engineer Uses a Shear to Size Reduce the Bulk Lime Handling Building.1209 viewsMay 02, 2026 at 06:07 PM
Operating Engineers Raze the Last Section of the Pilot Plant. The Facility was the Last of 10 Plants to be Removed from the Fernald Skyline.1821 viewsMay 02, 2026 at 06:07 PM
The Bio-Dentrification Tower and Plants 2 and 3 After Demolition. Excavation Crews are Now Removing the Below-Grade Portions of the Structures.1181 viewsMay 02, 2026 at 05:03 PM