Help | Contact Us
NukeWorker.com
NukeWorker Menu

Nuclear Pictures

NukeWorker online photo album.


Last additions - Region III (Mid West)
2012177.jpg
Oct 31, 2005
2012168.jpg
Oct 31, 2005
2012175.jpg
Oct 31, 2005
2012172.jpg
Oct 31, 2005
2012173.jpg
Oct 31, 2005
2012176.jpg
Oct 31, 2005
2012174.jpg
Oct 31, 2005
2012169.jpg
Oct 31, 2005
2012171.jpg
Oct 31, 2005
2012164.jpg
Oct 31, 2005
2012163.jpg
Oct 31, 2005
2012161.jpg
Oct 31, 2005
2012162.jpg
Oct 31, 2005
2012160.jpg
Oct 31, 2005
2011663.jpg
Oct 31, 2005
2012033.jpg
Oct 31, 2005
2011662.jpg
Oct 31, 2005
2011415.jpg
Oct 31, 2005
2012159.jpg
Oct 31, 2005
2011666.jpg
Oct 31, 2005
2011414.jpg
Oct 31, 2005
fernald_silo_11.jpg
Workers Finish Installing a Bridge Crane in the Silos 1 and 2 Treatment Facility that will be used to Load the Waste Containers for Transportation Off Site.Oct 30, 2005
fernald_silo_9.jpg
Workers are Trained how to Operate the Silo 3 Excavator.Oct 30, 2005
fernald_silo_10.jpg
Workers are Trained to Seal the Soft-Sided Packages that will be used for the Silo 3 Waste.Oct 30, 2005
fernald_silo_8.jpg
Silo 3 Treatment FacilityOct 30, 2005
fernald_silo_4.jpg
Fernald Silo 3 Project - Shipping PreparationsOct 30, 2005
fernald_silo_7.jpg
Work Continues in the Three Product Fill Rooms where the Casks will be Filled Robotically with the K-65 Stabilized Waste.Oct 30, 2005
fernald_silo_6.jpg
Fernald Silo 3 Project - Shipping PreparationsOct 30, 2005
fernald_silo_2.jpg
Fernald Silo 3 Project - Waste PackagingOct 30, 2005
fernald_llrw_5.jpg
Oct 30, 2005
fernald_silo_5.jpg
Fernald Silo 3 Project - Shipping ContainerOct 30, 2005
fernald_silo_1.jpg
Fernald Silo 3 Project - Waste RetrievalOct 30, 2005
fernald_llrw_3.jpg
Oct 30, 2005
fernald_llrw_2.jpg
Oct 30, 2005
fernald_llrw_4.jpg
Oct 30, 2005
fernald_llrw.jpg
Oct 30, 2005
fernald_DnD_14.jpg
Analytical Lab Decontamination and Demolition Project - An Operating Engineer uses Grapplers to Segregate Demolition Debris that Needs Further Size Reducing from that which can be Immediately Loaded for Transfer to the On-Site Disposal Facility (OSDF).Oct 30, 2005
fernald_DnD_11.jpg
An Operating Engineer Loads Building Debris into an Articulation Dump Truck on the Pad of the Lab Building.Oct 30, 2005
fernald_DnD_13.jpg
Operating Engineers Topple the Last Section of Plant 8 by Pushing the Structure to the Ground.Oct 30, 2005
fernald_DnD_12.jpg
Operating Engineers use Shears to Cut Away Sections of Plant 8.Oct 30, 2005
fernald_DnD_8.jpg
Workers Remove Process Piping in the Pilot Plant as Part of the Demolition Process.Oct 30, 2005
fernald_DnD_9.jpg
Workers Install Insulation on Piping in the TTA Building.Oct 30, 2005
fernald_DnD_10.jpg
Electricians Install Various Sizes of Conduit in the Electrical Room.Oct 30, 2005
fernald_DnD_6.jpg
The Bio-Dentrification Tower and Plants 2 and 3 Prior to Demolition.Oct 30, 2005
fernald_DnD_7.jpg
Plants 2, 3 and 8 After Demolition.Oct 30, 2005
fernald_DnD_5.jpg
The Bio-Dentrification Tower and Plants 2 and 3 After Demolition. Excavation Crews are Now Removing the Below-Grade Portions of the Structures.Oct 30, 2005
fernald_DnD_4.jpg
Workers Remove Transite Panels from the Pilot Plant in Preparation for the Demolition of the Concrete Structure.Oct 30, 2005
fernald_DnD_0.jpg
Early Demolition Stages of Plants 2, 3 and 8.Oct 30, 2005
fernald_cells_6.jpg
Operating Engineers use Grapplers and Bulldozers to Place and Compact Demolition Debris in Cell 4 of the On-Site Disposal Facility (OSDF).Oct 30, 2005
fernald_cells_3.jpg
Two Crews Work to Remove Waste Material from Pit 2.Oct 30, 2005
fernald_cells_4.jpg
A Supervisor Gives Instructions to an Operating Engineer in Pit 3.Oct 30, 2005
fernald_DnD_2.jpg
Fernald's K-65 Silos are Gone.Oct 30, 2005
fernald_DnD_1.jpg
The Decontamination and Demolition Project Work Scope Includes the Dismantlement of 259 Former Production Plants, Support Structures and Associated Components.Oct 30, 2005
fernald_cells_5.jpg
A Member of the Waste Acceptance Organization Inspects a Section of Pipe Before Allowing Workers to Move it to the On-Site Disposal Facility (OSDF).Oct 30, 2005
fernald_cells_2.jpg
An Iron Worker Installs Rebar at Valve House 7.Oct 30, 2005
2012981.jpg
An Electrician Verifies that One of the Motor Controls that will Operate a Piece of Equipment in the Silos 1 and 2 Treatment Facility Works Correctly.Oct 30, 2005
2012963.jpg
A Teamster Places Impacted Material Around Demolition Debris in Cell 4 of the On-Site Disposal Facility.Oct 30, 2005
fernald_cells_1.jpg
Workers Expose the Cell 6 Liner to Prepare the Surface for Attachment to the Cell 7 Liner.Oct 30, 2005
2012965.jpg
Plants 2 and 3 Decontamination and Demolition Project - An Operating Engineer Uses a Shear to Size Reduce the Bulk Lime Handling Building.Oct 30, 2005
2012983.jpg
A Member of the Quality Assurance Group Watches as a Worker Installs a HEPA Filter at Silo 3.Oct 30, 2005
2012978.jpg
A Supervisor and a Member of the Site's Waste Acceptance Organization Watch as Operating Engineers Shear a Section of the Analytical Lab.Oct 30, 2005
2012964.jpg
Workers Topple the Bulk Lime Handling Building.Oct 30, 2005
2012969.jpg
Silos 1 and 2 Waste Retrieval Project - Iron Workers Assemble Waste Container Handling Equipment.Oct 30, 2005
2012962.jpg
Operating Engineers Cover Demolition Debris from the Analytical Laboratory with Impacted Soil in Cell 4 of the On-Site Disposal Facility.Oct 30, 2005
3.jpg
Fernald Silo 3 Project - Waste Packaging StationOct 30, 2005
fernald_map_bw.jpg
Fermald MapOct 30, 2005
fernald_map_canceptial_future_use.jpg
Conceptual ImageOct 30, 2005
fernald_map.jpg
Fernald MapOct 30, 2005
baker_map~0.jpg
Baker Brother MapOct 30, 2005
bt_map.jpg
B and T Metals MapOct 30, 2005
aa_map.jpg
Associate Aircraft MapOct 30, 2005
KSV_Zion_Use_2.jpg
Zion Nuclear Power PlantSep 20, 2005
zion.jpg
Zion MapSep 20, 2005
pict427.jpg
Zion Nuclear Power PlantSep 20, 2005
pict428.jpg
Zion Nuclear Power PlantSep 20, 2005
pict440.jpg
Zion Nuclear Power PlantSep 20, 2005
pict411.jpg
Prairie Island Nuclear Power PlantSep 16, 2005
pict466.jpg
High speed turbine rotor at Perry nuclear power plantSep 16, 2005
pict467.jpg
Low speed turbine rotors at Perry nuclear power plantSep 16, 2005
pict468.jpg
Perry Nuclear Power PlantSep 16, 2005
1352 files on 17 page(s) 11



NukeWorker ™ is a registered trademark of NukeWorker.com ™, LLC © 1996-2024 All rights reserved.
All material on this Web Site, including text, photographs, graphics, code and/or software, are protected by international copyright/trademark laws and treaties. Unauthorized use is not permitted. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute, in any manner, the material on this web site or any portion of it. Doing so will result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law.
Privacy Statement | Terms of Use | Code of Conduct | Spam Policy | Advertising Info | Contact Us | Forum Rules | Password Problem?