The Decontamination and Demolition Project Work Scope Includes the Dismantlement of 259 Former Production Plants, Support Structures and Associated Components.Oct 30, 2005
A Member of the Waste Acceptance Organization Inspects a Section of Pipe Before Allowing Workers to Move it to the On-Site Disposal Facility (OSDF).Oct 30, 2005
An Electrician Verifies that One of the Motor Controls that will Operate a Piece of Equipment in the Silos 1 and 2 Treatment Facility Works Correctly.Oct 30, 2005
A Teamster Places Impacted Material Around Demolition Debris in Cell 4 of the On-Site Disposal Facility.Oct 30, 2005
Workers Expose the Cell 6 Liner to Prepare the Surface for Attachment to the Cell 7 Liner.Oct 30, 2005
Plants 2 and 3 Decontamination and Demolition Project - An Operating Engineer Uses a Shear to Size Reduce the Bulk Lime Handling Building.Oct 30, 2005
A Member of the Quality Assurance Group Watches as a Worker Installs a HEPA Filter at Silo 3.Oct 30, 2005
A Supervisor and a Member of the Site's Waste Acceptance Organization Watch as Operating Engineers Shear a Section of the Analytical Lab.Oct 30, 2005
Silos 1 and 2 Waste Retrieval Project - Iron Workers Assemble Waste Container Handling Equipment.Oct 30, 2005
Operating Engineers Cover Demolition Debris from the Analytical Laboratory with Impacted Soil in Cell 4 of the On-Site Disposal Facility.Oct 30, 2005
Section of Falls City perimeter fence leaning outward, located near perimeter sign P38 alongOct 30, 2005