Help | Contact Us
NukeWorker Logo
NukeWorker Logo
NukeWorker.com
NukeWorker Menu

Nuclear Pictures

NukeWorker online photo album.


Most viewed - Fernald (FEMP)
Public Tours.jpg
Public Tours2364 views
18.jpg
Sampling the Derby1362 views
Fernald Topples Last Uranium Production Building.jpg
Operating Engineers Raze the Last Section of the Pilot Plant. The Facility was the Last of 10 Plants to be Removed from the Fernald Skyline.1288 views
Water Treatment Bypass Process.jpg
Water Treatment Bypass Process1285 views
fernald_DnD_4.jpg
Workers Remove Transite Panels from the Pilot Plant in Preparation for the Demolition of the Concrete Structure.1275 views
14.jpg
Uranium Green Salt1257 views
2012168.jpg
1240 views
25.jpg
Laundry1188 views
813686730218b5422fbc5583.medium.jpg
1174 views
19.jpg
Ingots of Fernald at Ashtabula1118 views
2011140.jpg
1101 views
2009809.jpg
1098 views
2009812.jpg
1092 views
17.jpg
Cooling the Derby1084 views
24.jpg
Back to Fernald1081 views
2012964.jpg
Workers Topple the Bulk Lime Handling Building.1052 views
15.jpg
Fernald Feed Materials Production Center1016 views
Waste Pits Project.jpg
Waste Pits Project1014 views
2011139.jpg
1008 views
70.jpg
Gas into Metal1003 views
2012967.jpg
994 views
Silos 1 and 2 Project.jpg
Silos 1 and 2 Project980 views
2011665.jpg
978 views
2011664.jpg
948 views
Silo 3 Project.jpg
Silo 3 Project935 views
2012974.jpg
916 views
2012972.jpg
916 views
2012705.jpg
905 views
Decontamination & Demolition.jpg
Decontamination & Demolition898 views
2012983.jpg
A Member of the Quality Assurance Group Watches as a Worker Installs a HEPA Filter at Silo 3.888 views
2012773.jpg
886 views
2012772.jpg
881 views
2012707.jpg
880 views
2012971.jpg
879 views
2012966.jpg
873 views
2008966.jpg
871 views
2012702.jpg
862 views
fernald_silo_1.jpg
Fernald Silo 3 Project - Waste Retrieval861 views
2012970.jpg
858 views
2012969.jpg
Silos 1 and 2 Waste Retrieval Project - Iron Workers Assemble Waste Container Handling Equipment.857 views
fernald_cells_2.jpg
An Iron Worker Installs Rebar at Valve House 7.857 views
fernald_silo_2.jpg
Fernald Silo 3 Project - Waste Packaging857 views
2012968.jpg
853 views
Ecological Restoration.jpg
Ecological Restoration847 views
2011414.jpg
843 views
2012973.jpg
841 views
2012703.jpg
838 views
fernald_llrw_5.jpg
837 views
d6997bebc981dba6fdc3c603.medium.jpg
832 views
2012178.jpg
828 views
fernald_silo_9.jpg
Workers are Trained how to Operate the Silo 3 Excavator.827 views
2010147.jpg
827 views
2012704.jpg
822 views
fernald_DnD_0.jpg
Early Demolition Stages of Plants 2, 3 and 8.818 views
2012190.jpg
818 views
fernald_DnD_10.jpg
Electricians Install Various Sizes of Conduit in the Electrical Room.816 views
2010146.jpg
816 views
fernald_llrw_3.jpg
811 views
5ffaa93d84063721ae8440e5.medium.jpg
811 views
2010136.jpg
810 views
2010141.jpg
809 views
fernald_silo_7.jpg
Work Continues in the Three Product Fill Rooms where the Casks will be Filled Robotically with the K-65 Stabilized Waste.803 views
fernald_DnD_8.jpg
Workers Remove Process Piping in the Pilot Plant as Part of the Demolition Process.801 views
2008967.jpg
798 views
2012978.jpg
A Supervisor and a Member of the Site's Waste Acceptance Organization Watch as Operating Engineers Shear a Section of the Analytical Lab.794 views
fernald_DnD_12.jpg
Operating Engineers use Shears to Cut Away Sections of Plant 8.791 views
2012708.jpg
788 views
fernald-map3.jpg
Fernald787 views
fernald_silo_10.jpg
Workers are Trained to Seal the Soft-Sided Packages that will be used for the Silo 3 Waste.785 views
fernald_DnD_2.jpg
Fernald's K-65 Silos are Gone.784 views
fernald_DnD_9.jpg
Workers Install Insulation on Piping in the TTA Building.782 views
femp_fig1.jpg
Fernald Environmental Project (FEMP)779 views
fernald_cells_5.jpg
A Member of the Waste Acceptance Organization Inspects a Section of Pipe Before Allowing Workers to Move it to the On-Site Disposal Facility (OSDF).776 views
2010142.jpg
773 views
2010148.jpg
773 views
fernald_silo_4.jpg
Fernald Silo 3 Project - Shipping Preparations771 views
fernald_cells_6.jpg
Operating Engineers use Grapplers and Bulldozers to Place and Compact Demolition Debris in Cell 4 of the On-Site Disposal Facility (OSDF).769 views
fernald_silo_8.jpg
Silo 3 Treatment Facility768 views
2012706.jpg
768 views
fernald_silo_6.jpg
Fernald Silo 3 Project - Shipping Preparations767 views
167 files on 3 page(s) 1


NukeWorker ™ is a registered trademark of NukeWorker.com ™, LLC © 1996-2025 All rights reserved.
All material on this Web Site, including text, photographs, graphics, code and/or software, are protected by international copyright/trademark laws and treaties. Unauthorized use is not permitted. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute, in any manner, the material on this web site or any portion of it. Doing so will result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law.
Privacy Statement | Terms of Use | Code of Conduct | Spam Policy | Advertising Info | Contact Us | Forum Rules | Password Problem?