Operating Engineers Raze the Last Section of the Pilot Plant. The Facility was the Last of 10 Plants to be Removed from the Fernald Skyline.1288 views
Water Treatment Bypass Process1285 views
Workers Remove Transite Panels from the Pilot Plant in Preparation for the Demolition of the Concrete Structure.1275 views
Uranium Green Salt1257 views
1240 views
Laundry1188 views
1174 views
Ingots of Fernald at Ashtabula1118 views
1101 views
1098 views
1092 views
Cooling the Derby1084 views
Back to Fernald1081 views
Workers Topple the Bulk Lime Handling Building.1052 views
Fernald Feed Materials Production Center1016 views
Waste Pits Project1014 views
1008 views
Gas into Metal1003 views
994 views
Silos 1 and 2 Project980 views
978 views
948 views
Silo 3 Project935 views
916 views
916 views
905 views
Decontamination & Demolition898 views
A Member of the Quality Assurance Group Watches as a Worker Installs a HEPA Filter at Silo 3.888 views
886 views
881 views
880 views
879 views
873 views
871 views
862 views
Fernald Silo 3 Project - Waste Retrieval861 views
858 views
Silos 1 and 2 Waste Retrieval Project - Iron Workers Assemble Waste Container Handling Equipment.857 views
An Iron Worker Installs Rebar at Valve House 7.857 views
Fernald Silo 3 Project - Waste Packaging857 views
853 views
Ecological Restoration847 views
843 views
841 views
838 views
837 views
832 views
828 views
Workers are Trained how to Operate the Silo 3 Excavator.827 views
827 views
822 views
Early Demolition Stages of Plants 2, 3 and 8.818 views
818 views
Electricians Install Various Sizes of Conduit in the Electrical Room.816 views
816 views
811 views
811 views
810 views
809 views
Work Continues in the Three Product Fill Rooms where the Casks will be Filled Robotically with the K-65 Stabilized Waste.803 views
Workers Remove Process Piping in the Pilot Plant as Part of the Demolition Process.801 views
798 views
A Supervisor and a Member of the Site's Waste Acceptance Organization Watch as Operating Engineers Shear a Section of the Analytical Lab.794 views
Operating Engineers use Shears to Cut Away Sections of Plant 8.791 views
788 views
Fernald787 views
Workers are Trained to Seal the Soft-Sided Packages that will be used for the Silo 3 Waste.785 views
Fernald's K-65 Silos are Gone.784 views
Workers Install Insulation on Piping in the TTA Building.782 views
Fernald Environmental Project (FEMP)779 views
A Member of the Waste Acceptance Organization Inspects a Section of Pipe Before Allowing Workers to Move it to the On-Site Disposal Facility (OSDF).776 views