Operating Engineers Raze the Last Section of the Pilot Plant. The Facility was the Last of 10 Plants to be Removed from the Fernald Skyline.964 views
Workers Remove Transite Panels from the Pilot Plant in Preparation for the Demolition of the Concrete Structure.948 views
Sampling the Derby906 views
Water Treatment Bypass Process882 views
824 views
Uranium Green Salt809 views
Ingots of Fernald at Ashtabula792 views
782 views
Laundry768 views
Cooling the Derby753 views
Back to Fernald752 views
Workers Topple the Bulk Lime Handling Building.725 views
Fernald Feed Materials Production Center692 views
Waste Pits Project681 views
674 views
Gas into Metal667 views
Silos 1 and 2 Project664 views
663 views
660 views
Silo 3 Project598 views
590 views
582 views
577 views
574 views
Decontamination & Demolition564 views
559 views
552 views
A Member of the Quality Assurance Group Watches as a Worker Installs a HEPA Filter at Silo 3.551 views
551 views
546 views
539 views
536 views
An Iron Worker Installs Rebar at Valve House 7.534 views
Fernald Silo 3 Project - Waste Packaging534 views
Ecological Restoration532 views
531 views
531 views
525 views
Silos 1 and 2 Waste Retrieval Project - Iron Workers Assemble Waste Container Handling Equipment.524 views
Fernald Silo 3 Project - Waste Retrieval524 views
520 views
518 views
513 views
511 views
505 views
505 views
503 views
500 views
Electricians Install Various Sizes of Conduit in the Electrical Room.499 views
Early Demolition Stages of Plants 2, 3 and 8.491 views
487 views
486 views
480 views
Workers are Trained how to Operate the Silo 3 Excavator.478 views
478 views
478 views
475 views
474 views
474 views
Workers Remove Process Piping in the Pilot Plant as Part of the Demolition Process.465 views
Fernald460 views
Work Continues in the Three Product Fill Rooms where the Casks will be Filled Robotically with the K-65 Stabilized Waste.459 views
458 views
Workers Install Insulation on Piping in the TTA Building.457 views
457 views
455 views
455 views
Workers are Trained to Seal the Soft-Sided Packages that will be used for the Silo 3 Waste.454 views
A Supervisor and a Member of the Site's Waste Acceptance Organization Watch as Operating Engineers Shear a Section of the Analytical Lab.452 views
A Member of the Waste Acceptance Organization Inspects a Section of Pipe Before Allowing Workers to Move it to the On-Site Disposal Facility (OSDF).450 views
Operating Engineers use Shears to Cut Away Sections of Plant 8.449 views