Analytical Lab Decontamination and Demolition Project - An Operating Engineer uses Grapplers to Segregate Demolition Debris that Needs Further Size Reducing from that which can be Immediately Loaded for Transfer to the On-Site Disposal Facility (OSDF).424 views
424 views
424 views
Painesville Locality Map423 views
423 views
422 views
422 views
422 views
422 views
421 views
420 views
420 views
420 views
A Supervisor Gives Instructions to an Operating Engineer in Pit 3.419 views
419 views
419 views
419 views
419 views
418 views
418 views
418 views
418 views
418 views
Silo 3 Treatment Facility417 views
Workers Finish Installing a Bridge Crane in the Silos 1 and 2 Treatment Facility that will be used to Load the Waste Containers for Transportation Off Site.417 views
417 views
417 views
416 views
416 views
416 views
Fernald Environmental Project (FEMP)415 views
Operating Engineers Cover Demolition Debris from the Analytical Laboratory with Impacted Soil in Cell 4 of the On-Site Disposal Facility.415 views
Operating Engineers Topple the Last Section of Plant 8 by Pushing the Structure to the Ground.415 views