A Teamster Places Impacted Material Around Demolition Debris in Cell 4 of the On-Site Disposal Facility.387 views
387 views
386 views
Fermald Map386 views
386 views
Colonie Locality Map386 views
385 views
Plants 2 and 3 Decontamination and Demolition Project - An Operating Engineer Uses a Shear to Size Reduce the Bulk Lime Handling Building.385 views
385 views
385 views
385 views
384 views
384 views
384 views
384 views
Conceptual Image383 views
383 views
382 views
382 views
382 views
382 views
382 views
382 views
TECHNICIAN AT THE B FACTORY'S HUGE BABAR DETECTOR SYSTEM AT THE STANFORD LINEAR ACCELERATOR CENTER.381 views
381 views
380 views
An Electrician Verifies that One of the Motor Controls that will Operate a Piece of Equipment in the Silos 1 and 2 Treatment Facility Works Correctly.380 views
The Bio-Dentrification Tower and Plants 2 and 3 Prior to Demolition.379 views
379 views
379 views
379 views
379 views
377 views
377 views
377 views
376 views
The Decontamination and Demolition Project Work Scope Includes the Dismantlement of 259 Former Production Plants, Support Structures and Associated Components.375 views
375 views
Colonie Map374 views
Colonie FUSRAP Site Map374 views
374 views
373 views
373 views
373 views
372 views
372 views
371 views
371 views
Falls City Map371 views
371 views
The Maybell uranium mill site is located 5 miles northeast of the town of Maybell in Moffat County, Colorado.371 views
University of Chicago Site371 views
370 views
Two Crews Work to Remove Waste Material from Pit 2.370 views
370 views
369 views
369 views
369 views
369 views
368 views
An Operating Engineer Loads Building Debris into an Articulation Dump Truck on the Pad of the Lab Building.368 views
LBNL Map368 views
368 views
The Bio-Dentrification Tower and Plants 2 and 3 After Demolition. Excavation Crews are Now Removing the Below-Grade Portions of the Structures.367 views