Started by Rennhack, Jun 16, 2010, 02:15

Previous topic - Next topic

0 Members and 1 Guest are viewing this topic.

Rennhack

South Carolina Electric & Gas (SCE&G) submitted to obtain a combined license (COL) for two Westinghouse Advanced Passive 1000 (AP1000) pressurized-water reactors (PWRs) designated as Virgil C. Summer Nuclear Station, Units 2 & 3.

On March 27, 2008, South Carolina Electric & Gas applied to the Nuclear Regulatory Commission (NRC) for a Combined Construction and Operating License (COL) to build two 1,100 MW AP1000 pressurized water reactors at the site. On May 27, 2008, SCE&G and Santee Cooper announced an engineering, procurement, and construction (EPC) contract had been reached with Westinghouse. Costs are estimated to be approximately $9.8 billion for both AP1000 units, plus transmission facility and financing costs. The operators are filing an application to increase customers bills by $1.2 billion (2.5%) during the construction period to partially finance capital costs. Presuming that the Nuclear Regulatory Commission (NRC) issues the construction licenses in 2011, SCE&G plans to bring the first of the new units online in 2016, with the second in 2019.


Source: http://www.nrc.gov/reactors/new-reactors/col/summer.html
Source: http://www.nrc.gov/reactors/new-reactors/col/summer/documents.html
Source: http://en.wikipedia.org/wiki/Virgil_C._Summer_Nuclear_Generating_Station

mostlyharmless

Love it. I worked VC years ago, lot of good folks there. How bout the rest of the new nukes? Vogtle is still rolling with theirs.

tr


dgielow

dose any one know who is going to be  doing the work at 2 &3? Who is the onsite contractor ?  ANY ONE

redline

Those units are gonna sell real cheap when Duke buys the parent company for what they have invested in their new units!

RP Instructor

Santee Cooper was looking to sell their 45% interest in Units 2 and 3. Duke might just be a suitor.

cairnit

Anything new about the new units? They hiring welders yet?

HeavyD

I would check the website for job opportunities.

As far as welders, we are not hiring any maintenance type personnel at this time.  Looking at going on-line sometime in 2016, if I recall correctly, for Unit 2.

Shaw is the construction company building the new units.  THEY may be hiring construction welders, but again, I'm not sure.

Best of luck to ya :)

leavingreality

Anything new on the new plants? Say potential hiring dates for in-house operations/RP?

I've heard rumors they were supposed to start hiring RP this coming spring, but then the start-ups got pushed back. Didn't know if that pushed back hiring.

Anyone out there with an inside scoop?

HeavyD

As far as has been communicated to us, we will continue posting positions for Maintenance, Operators, Technical (Chemistry and maybe HP), and Security in the coming year.

No specifics on numbers or anything like that.

Keep checking the corporate site.

leavingreality

Quote from: HeavyD on Dec 19, 2013, 03:45
As far as has been communicated to us, we will continue posting positions for Maintenance, Operators, Technical (Chemistry and maybe HP), and Security in the coming year.

No specifics on numbers or anything like that.

Keep checking the corporate site.
Trust me. I'm checking every week. I'm a VY casualty so I've got some time, but Summer would be ideal.

RFaunt

Here's the link to the briefs from NEI's RP Forum last month. Moses Coleman briefed the projected hiring plans and dates for VC Summers.

http://www.nei.org/Conferences/Conference-Archives/Radiation-Protection-Health-Physics-Archives

Hope it provides some helpful info.
"If I have seen further, it is by standing on the shoulders of giants." ~ Isaac Newton

SCMasterchef

All you guys looking to go to Summer for HP jobs better remember that the salaries in this part of the country are significantly, and I repeat, significantly lower than about 90% of the rest of the plants in the US.  The area is not that great and it is the south.

HeavyD

Here's a short video WEC produced, showing one of Unit 2's Steam Generators on its trip from Charleston to the site.

https://www.youtube.com/watch?v=lCoGsmDxl-c


NukeWorker ™ is a registered trademark of NukeWorker.com ™, LLC © 1996-2025 All rights reserved.
All material on this Web Site, including text, photographs, graphics, code and/or software, are protected by international copyright/trademark laws and treaties. Unauthorized use is not permitted. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute, in any manner, the material on this web site or any portion of it. Doing so will result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law.
Privacy Statement | Terms of Use | Code of Conduct | Spam Policy | Advertising Info | Contact Us | Forum Rules | Password Problem?