NukeWorker.com: Nuclear Jobs, Resumes, Outage Schedules, & RCT Training

NukeWorker Menu

Nuclear Pictures

NukeWorker online photo album.

WATTS BAR UNIT 2 TVA may resume construction of its Unit 2 reactor at Watts Bar Nuclear Plant, pending a comprehensive evaluation of the cost and schedule for completing the unit. Work on Unit 2, located closest to the cooling towers in the photo above, stopped in 1985. The detailed study will provide an evaluation of the engineering work, cost and timetable required to complete the unit.

WATTS BAR UNIT 2 TVA may resume construction of its Unit 2 reactor at Watts Bar Nuclear Plant, pending a comprehensive evaluation of the cost and schedule for completing the unit. Work on Unit 2, located closest to the cooling towers in the photo above, stopped in 1985. The detailed study will provide an evaluation of the engineering work, cost and timetable required to complete the unit.

Ivy.JPG Dresden_IFR.jpg mURI_temp_4f61433c.gif google-maps-palo-verde-number-one.jpg IMG00123-20091028-1649.JPG
File information
Filename:mURI_temp_4f61433c.gif
Album name:Rennhack / Watts Bar
Filesize:73 KiB
Date added:Aug 03, 2006
Dimensions:500 x 407 pixels
Displayed:2813 times
URL:https://www.nukeworker.com/pictures/displayimage.php?pid=5389
Favorites:Add to Favorites