Help | Contact Us
NukeWorker Menu

RP Reservation System

Started by Flynnmast, Oct 26, 2025, 06:01

Previous topic - Next topic

0 Members and 2 Guests are viewing this topic.

Flynnmast

Is anyone out there currently using any sort of reservation system for RP job coverage?  Specifically, non-outage for work outside the planned schedule? 

Just curious.  We currently use scheduling software for mask fits with Dosimetry and for truck entry to the salleyport for Security.  I don't think it would be a reach to give our techs a heads up with a system like this.

Thanks for any input.

Rennhack

This is a great idea, what software do you use?

NukeWorker ™ is a registered trademark of NukeWorker.com ™, LLC © 1996-2025 All rights reserved.
All material on this Web Site, including text, photographs, graphics, code and/or software, are protected by international copyright/trademark laws and treaties. Unauthorized use is not permitted. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute, in any manner, the material on this web site or any portion of it. Doing so will result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law.
Privacy Statement | Terms of Use | Code of Conduct | Spam Policy | Advertising Info | Contact Us | Forum Rules | Password Problem?