Operating Engineers Raze the Last Section of the Pilot Plant. The Facility was the Last of 10 Plants to be Removed from the Fernald Skyline.962 views
Workers Remove Transite Panels from the Pilot Plant in Preparation for the Demolition of the Concrete Structure.944 views
Sampling the Derby893 views
Water Treatment Bypass Process871 views
818 views
Uranium Green Salt799 views
Ingots of Fernald at Ashtabula787 views
770 views
Laundry756 views
Cooling the Derby748 views
Back to Fernald747 views
Workers Topple the Bulk Lime Handling Building.721 views
Fernald Feed Materials Production Center687 views
Waste Pits Project677 views
665 views
Gas into Metal662 views
Silos 1 and 2 Project658 views
654 views
651 views
Silo 3 Project593 views
580 views
571 views
568 views
568 views
Decontamination & Demolition559 views
552 views
546 views
546 views
A Member of the Quality Assurance Group Watches as a Worker Installs a HEPA Filter at Silo 3.545 views
535 views
An Iron Worker Installs Rebar at Valve House 7.529 views
Fernald Silo 3 Project - Waste Packaging529 views
529 views
Ecological Restoration528 views
527 views
526 views
526 views
522 views
Silos 1 and 2 Waste Retrieval Project - Iron Workers Assemble Waste Container Handling Equipment.519 views
Fernald Silo 3 Project - Waste Retrieval519 views
515 views
514 views
508 views
506 views
499 views
499 views
499 views
495 views
Electricians Install Various Sizes of Conduit in the Electrical Room.494 views
Early Demolition Stages of Plants 2, 3 and 8.487 views
482 views
481 views
474 views
473 views
Workers are Trained how to Operate the Silo 3 Excavator.472 views
472 views
471 views
467 views
465 views
Workers Remove Process Piping in the Pilot Plant as Part of the Demolition Process.462 views
Fernald459 views
455 views
Work Continues in the Three Product Fill Rooms where the Casks will be Filled Robotically with the K-65 Stabilized Waste.455 views
454 views
Workers Install Insulation on Piping in the TTA Building.453 views
451 views
451 views
Workers are Trained to Seal the Soft-Sided Packages that will be used for the Silo 3 Waste.450 views
A Supervisor and a Member of the Site's Waste Acceptance Organization Watch as Operating Engineers Shear a Section of the Analytical Lab.447 views
A Member of the Waste Acceptance Organization Inspects a Section of Pipe Before Allowing Workers to Move it to the On-Site Disposal Facility (OSDF).445 views
Operating Engineers use Shears to Cut Away Sections of Plant 8.443 views