Help | Contact Us
NukeWorker.com
NukeWorker Menu

Nuclear Pictures

NukeWorker online photo album.


Most viewed - Fernald (FEMP)
Public Tours.jpg
Public Tours2135 views
Fernald Topples Last Uranium Production Building.jpg
Operating Engineers Raze the Last Section of the Pilot Plant. The Facility was the Last of 10 Plants to be Removed from the Fernald Skyline.1059 views
fernald_DnD_4.jpg
Workers Remove Transite Panels from the Pilot Plant in Preparation for the Demolition of the Concrete Structure.1045 views
18.jpg
Sampling the Derby1043 views
Water Treatment Bypass Process.jpg
Water Treatment Bypass Process986 views
14.jpg
Uranium Green Salt949 views
813686730218b5422fbc5583.medium.jpg
929 views
2012168.jpg
922 views
25.jpg
Laundry888 views
19.jpg
Ingots of Fernald at Ashtabula879 views
17.jpg
Cooling the Derby848 views
24.jpg
Back to Fernald841 views
2012964.jpg
Workers Topple the Bulk Lime Handling Building.821 views
2011140.jpg
799 views
2009809.jpg
792 views
15.jpg
Fernald Feed Materials Production Center783 views
Waste Pits Project.jpg
Waste Pits Project782 views
70.jpg
Gas into Metal768 views
2009812.jpg
764 views
2012967.jpg
756 views
Silos 1 and 2 Project.jpg
Silos 1 and 2 Project750 views
Silo 3 Project.jpg
Silo 3 Project701 views
2011139.jpg
701 views
2012972.jpg
680 views
2012974.jpg
674 views
2011665.jpg
670 views
Decontamination & Demolition.jpg
Decontamination & Demolition664 views
2012705.jpg
661 views
2012707.jpg
657 views
2012971.jpg
657 views
2012983.jpg
A Member of the Quality Assurance Group Watches as a Worker Installs a HEPA Filter at Silo 3.652 views
2011664.jpg
650 views
2012773.jpg
645 views
2012772.jpg
640 views
2012970.jpg
640 views
fernald_silo_1.jpg
Fernald Silo 3 Project - Waste Retrieval634 views
2012966.jpg
633 views
2012968.jpg
633 views
fernald_silo_2.jpg
Fernald Silo 3 Project - Waste Packaging632 views
fernald_cells_2.jpg
An Iron Worker Installs Rebar at Valve House 7.631 views
Ecological Restoration.jpg
Ecological Restoration625 views
2012702.jpg
625 views
2012969.jpg
Silos 1 and 2 Waste Retrieval Project - Iron Workers Assemble Waste Container Handling Equipment.624 views
2011414.jpg
620 views
fernald_llrw_5.jpg
614 views
2012973.jpg
607 views
2012703.jpg
606 views
2010147.jpg
598 views
d6997bebc981dba6fdc3c603.medium.jpg
591 views
fernald_DnD_0.jpg
Early Demolition Stages of Plants 2, 3 and 8.590 views
2012190.jpg
590 views
2012704.jpg
589 views
2012178.jpg
588 views
fernald_DnD_10.jpg
Electricians Install Various Sizes of Conduit in the Electrical Room.587 views
fernald_silo_9.jpg
Workers are Trained how to Operate the Silo 3 Excavator.585 views
5ffaa93d84063721ae8440e5.medium.jpg
582 views
fernald_llrw_3.jpg
580 views
2010146.jpg
580 views
2008966.jpg
579 views
2010136.jpg
575 views
fernald_silo_7.jpg
Work Continues in the Three Product Fill Rooms where the Casks will be Filled Robotically with the K-65 Stabilized Waste.570 views
2010141.jpg
569 views
fernald_DnD_8.jpg
Workers Remove Process Piping in the Pilot Plant as Part of the Demolition Process.567 views
2012978.jpg
A Supervisor and a Member of the Site's Waste Acceptance Organization Watch as Operating Engineers Shear a Section of the Analytical Lab.559 views
fernald_DnD_12.jpg
Operating Engineers use Shears to Cut Away Sections of Plant 8.556 views
fernald_DnD_9.jpg
Workers Install Insulation on Piping in the TTA Building.554 views
fernald-map3.jpg
Fernald553 views
2012708.jpg
553 views
fernald_silo_10.jpg
Workers are Trained to Seal the Soft-Sided Packages that will be used for the Silo 3 Waste.551 views
2008967.jpg
551 views
fernald_DnD_2.jpg
Fernald's K-65 Silos are Gone.550 views
fernald_cells_5.jpg
A Member of the Waste Acceptance Organization Inspects a Section of Pipe Before Allowing Workers to Move it to the On-Site Disposal Facility (OSDF).547 views
femp_fig1.jpg
Fernald Environmental Project (FEMP)542 views
2010142.jpg
541 views
2010148.jpg
540 views
2012033.jpg
539 views
fernald_cells_6.jpg
Operating Engineers use Grapplers and Bulldozers to Place and Compact Demolition Debris in Cell 4 of the On-Site Disposal Facility (OSDF).537 views
fernald_silo_4.jpg
Fernald Silo 3 Project - Shipping Preparations534 views
2010150.jpg
531 views
fernald_silo_6.jpg
Fernald Silo 3 Project - Shipping Preparations530 views
167 files on 3 page(s) 1



NukeWorker ™ is a registered trademark of NukeWorker.com ™, LLC © 1996-2025 All rights reserved.
All material on this Web Site, including text, photographs, graphics, code and/or software, are protected by international copyright/trademark laws and treaties. Unauthorized use is not permitted. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute, in any manner, the material on this web site or any portion of it. Doing so will result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law.
Privacy Statement | Terms of Use | Code of Conduct | Spam Policy | Advertising Info | Contact Us | Forum Rules | Password Problem?