University of Michigan FNR

Permanently Shut Down

Ann Arbor, MI·Pool

Technical specifications, NRC licensing data, photos, nearby jobs, satellite map, and per diem rates for University of Michigan FNR.

Permanently Shut Down

Permanently shut down on 1957-09-13.

Reactor Data

Research Reactors

?
Research and test reactors, critical assemblies and prototypes at this site, as listed in the IAEA Research Reactor Database: type, thermal power, first criticality, shutdown date, current status and what each is used for.
1 reactor: 1 decommissioned.
Reactor Type Thermal Power First Criticality Shutdown Status Used For
Ford Nuclear Reactor Univ. Michigan Pool 2 MWt 1957-09-18 Decommissioned neutron scattering, neutron radiography, materials testing, teaching
Source: IAEA Research Reactor Database (RRDB), as of 2026-10-13.

Working Here

Per Diem Rates FY 2027

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from GSA for FY 2027.
$140
Lodging/Night
$80
M&IE/Day
$220
Total/Day
Ann Arbor, Washtenaw County, MI

Unemployment Benefits MI

?
Maximum state unemployment insurance benefits for MI. Actual benefits depend on your earnings history and may be lower than the maximum. Data as of Jan 2026.
$530
Max Weekly
26
Max Weeks
$13,780
Max Total

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
2301 Bonisteel Boulevard
Ann Arbor, MI 48109, USA
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Ford Nuclear Reactor.

The Ford Nuclear Reactor was a pool-type research reactor on the North Campus of the University of Michigan in Ann Arbor, housed in the Phoenix Memorial Laboratory building.

Read more

It reached first criticality on September 19, 1957, and its initial rated power of 1 megawatt was reached in August 1958. Its power was upgraded to 2 megawatts on August 5, 1963. In December 1981 the reactor was converted from 93 percent enriched fuel to 19.5 percent enriched fuel. It operated until July 3, 2003, when the university chose to decommission it.

Technical Specs

?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Reactor Type: Pool
Status: Decon

Licensing

?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #: 502