Almelo

Technical specifications, photos, nearby jobs, and satellite map for Almelo.

Facility Data

Fuel Cycle Facilities

?
Fuel cycle plants at this site, as listed in the IAEA Nuclear Fuel Cycle Facilities Database: what each plant does, its scale and design capacity, the years it operated, its current status and who operates it.
2 facilities: 2 in operation.
Facility Type Scale Design Capacity Operated Status Operator
Molybdenum production Facilities Related Industrial Activities Commercial 1961– In Operation NRG
Urenco Nederland Uranium Enrichment Commercial 6200 MTSWU/year 1973– In Operation Urenco Nederland B.V
Source: IAEA Nuclear Fuel Cycle Facilities Database (NFCFDB), as of 2026-10-13.

Working Here

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$192
Lodging/Night
$120
M&IE/Day
$312
Total/Day
Netherlands: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Almelo, Overijssel, Netherlands
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Fissile Materials Library: Treaty of Almelo; Urenco: Netherlands location; IAEA INIS: Safeguards at the Dutch and German URENCO plants.

Almelo is a city in the province of Overijssel, in the eastern Netherlands, and the original home of the Urenco enrichment company's Dutch plant. The Treaty of Almelo, signed on March 4, 1970 by the United Kingdom, West Germany and the Netherlands, set up cooperation on uranium enrichment by the gas centrifuge process.

Read more

Urenco was incorporated in 1971. A Dutch pilot plant (SP1) and a German pilot plant (SP2) were built at Almelo in the early 1970s, and experience from them shaped the joint demonstration plant SP3. Urenco dates the formal installation of its first commercial-scale plant at Almelo to 1977. Plant SP5 started up in 2000. Plants SP1 to SP3 were later decommissioned and their sites returned to greenfield.