Boeing-Rocketdyne

Santa Susana, CA

Technical specifications, photos, nearby jobs, satellite map, and per diem rates for Boeing-Rocketdyne.

Reactor Data

Research Reactors

?
Research and test reactors, critical assemblies and prototypes at this site, as listed in the IAEA Research Reactor Database: type, thermal power, first criticality, shutdown date, current status and what each is used for.
17 reactors: 17 decommissioned.
Reactor Type Thermal Power First Criticality Shutdown Status Used For
L-85 Nuclear Examination Homog (l) 3 kWt 1952-04-21 Decommissioned materials testing, training
KEWB Kinetic Experiment Homog (l) 5 kWt 1956-07-01 Decommissioned materials testing, nuclear data
SGR CA Sodium Graphite Crit Assembly 1 Wt 1957-04-25 Decommissioned nuclear data
OMR Organic Moderated Reactor Crit Assembly 1 Wt 1958-07-01 Decommissioned
SNAP Experimental Reactor Space Test 5 kWt 1959-09-01 Decommissioned
AETR Advanced Epithermal Thorium Crit Fast 1 Wt 1960-01-01 Decommissioned nuclear data
SNAP 2 Demonstration Reactor Space Test 65 kWt 1961-04-03 Decommissioned
SNAP CA-4A Crit Assembly 100 Wt 1962-01-01 Decommissioned materials testing
SNAP CA-4B Crit Assembly 100 Wt 1962-02-15 Decommissioned materials testing
SNAP CA-4C Crit Assembly 100 Wt 1962-04-16 Decommissioned materials testing
SNAPTRAN-1 Zrh, Be Reflect 40 Wt 1963-01-01 Decommissioned
SNAP 8 Experimental Reactor Space Test 6 kWt 1963-04-01 Decommissioned
STIR Shield Test and Irradiation Reactor Pool 1 MWt 1964-08-01 Decommissioned materials testing
SNAP CA-5 Crit Assembly 100 Wt 1964-10-29 Decommissioned nuclear data
SNAP 10 F-3 Space Test 44 kWt 1965-01-22 Decommissioned
SNAP 8 Demonstration Reactor Space Test 619 kWt 1969-01-01 Decommissioned
HMRFSR Crit Fast 200 Wt 1970-01-01 Decommissioned materials testing
Source: IAEA Research Reactor Database (RRDB), as of 2026-10-13.

Fuel Cycle Facilities

?
Fuel cycle plants at this site, as listed in the IAEA Nuclear Fuel Cycle Facilities Database: what each plant does, its scale and design capacity, the years it operated, its current status and who operates it.
1 facility: 1 decommissioned.
Facility Type Scale Design Capacity Operated Status Operator
Nuclear Material Development Facility MOX fuel fabrication (Mox Powder, Pellet, Pin, FA) Laboratory 0 t HM/year 1967–1980 Decommissioned
Source: IAEA Nuclear Fuel Cycle Facilities Database (NFCFDB), as of 2026-10-13.

Working Here

Per Diem Rates FY 2027

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from GSA for FY 2027.
$199
Lodging/Night
$86
M&IE/Day
$285
Total/Day
Los Angeles, Los Angeles / Orange / Ventura / Edwards AFB less the city of Santa Monica County, CA

Unemployment Benefits CA

?
Maximum state unemployment insurance benefits for CA. Actual benefits depend on your earnings history and may be lower than the maximum. Data as of Jan 2026.
$450
Max Weekly
26
Max Weeks
$11,700
Max Total
7-day waiting period before benefits begin

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Santa Susana, CA 93063, USA
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Santa Susana Field Laboratory.

This entry corresponds to the Santa Susana Field Laboratory, a former rocket engine test and nuclear research site in the Simi Hills of unincorporated Ventura County, California, between Simi Valley and Los Angeles. It covers about 2,668 acres.

Read more

The site was chosen in 1947 for its remoteness. From 1949 to 2006 it was used mainly for liquid-propellant rocket engine development and testing. Nuclear reactors operated there from 1953 to 1980, without containment structures. The Sodium Reactor Experiment operated from 1957 to 1964 and was the first U.S. reactor to supply electricity to a commercial grid. It suffered a partial core meltdown in 1959 and was removed in 1981. Boeing became the primary owner in 1996, and research and development ceased in 2006 as environmental cleanup began.