Chinon

Technical specifications, photos, nearby jobs, and satellite map for Chinon.

Reactor Data

Reactor Units

?
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
7 units: 4 operational, 3 permanent shutdown. Net capacity in service: 3,620 MWe.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
Chinon A-1 GCR UNGG 70 1957-02-01 1963-06-14 1964-02-01 1973-04-16 Permanent Shutdown
Chinon A-2 GCR UNGG 180 1959-08-01 1965-02-24 1965-02-24 1985-06-14 Permanent Shutdown
Chinon A-3 GCR UNGG 360 1961-03-01 1966-08-04 1966-08-04 1990-06-15 Permanent Shutdown
Chinon B-1 PWR CP2 905 1977-03-01 1982-11-30 1984-02-01 Operational
Chinon B-2 PWR CP2 905 1977-03-01 1983-11-29 1984-08-01 Operational
Chinon B-3 PWR CP2 905 1980-10-01 1986-10-20 1987-03-04 Operational
Chinon B-4 PWR CP2 905 1981-02-01 1987-11-14 1988-04-01 Operational
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
Chinon A-1 68 80 300 1962-09-16 LEVIVIER ALSTOM
Chinon A-2 170 230 800 1964-08-17 LEVIVIER ALSTOM
Chinon A-3 480 480 1,170 1966-03-01 GRANDS TRAVAUX DE MARSEILLE ALSTOM
Chinon B-1 870 954 2,785 1982-10-28 FRAMATOME ALSTOM
Chinon B-2 870 954 2,785 1983-09-23 FRAMATOME ALSTOM
Chinon B-3 905 954 2,785 1986-09-18 FRAMATOME ALSTOM
Chinon B-4 905 954 2,785 1987-10-13 FRAMATOME ALSTOM
Lifetime performance, through 2025
Unit Electricity Supplied Load Factor Energy Availability Operating Factor
Chinon A-1 3.0 TWh 41.2% 39.1% 39.8%
Chinon A-2 24.9 TWh 70.9% 70.9% 74.9%
Chinon A-3 30.6 TWh 40.6% 41.8% 49.2%
Chinon B-1 239.3 TWh 70.9% 74.3% 76.3%
Chinon B-2 239.0 TWh 72.5% 76.3% 77.9%
Chinon B-3 221.5 TWh 71.6% 75.5% 77.3%
Chinon B-4 224.4 TWh 74.6% 78.3% 80.6%
Operator: ÉLECTRICITÉ DE FRANCE
Owner: ÉLECTRICITÉ DE FRANCE
Source: IAEA Power Reactor Information System (PRIS), as of 2026-11-02.

Working Here

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$220
Lodging/Night
$132
M&IE/Day
$352
Total/Day
France: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Avoine, Centre-Val de Loire, France
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Chinon Nuclear Power Plant.

Chinon is a nuclear power site in the commune of Avoine, in the Indre-et-Loire department of Centre-Val de Loire. It stands on the Loire river, about 10 km from the town of Chinon. The site has two generations of reactors, the A series and the B series.

Read more

The three A units were gas-cooled, graphite-moderated (UNGG) reactors. Construction of Chinon A-1 began in February 1957, and the units were connected to the grid in 1963, 1965 and 1966. They were permanently shut down in 1973, 1985 and 1990. The four B units are pressurized water reactors, with construction starting in 1977 for B-1 and B-2, in 1980 for B-3 and in 1981 for B-4. They were first connected to the grid between 1982 and 1987.