11 reactors: 8 operational, 2 decommissioned, 1 under construction.
Reactor Type Thermal Power First Criticality Shutdown Status Used For
SM-3 Pressure Vessel 1 MWt 1961-01-10 Operational isotope production, materials testing, transmutation, activation analysis, training
VK-50 Bwr-prototype 2 MWt 1964-12-15 Operational materials testing, activation analysis, training
FM MIR.M1 Crit Assembly 5 Wt 1966-10-30 Operational teaching, training
MIR.M1 Pool/channels 1 MWt 1966-12-24 Operational isotope production, materials testing, activation analysis, training
BOR-60 Fast Breeder 60 MWt 1968-12-30 Operational isotope production, materials testing, training
FM SM-3 Crit Assembly 20 Wt 1970-01-01 Operational teaching, training
RBT-6 Pool 6 MWt 1975-09-24 Operational isotope production, materials testing, transmutation, activation analysis
RBT-10/2 Pool 7 MWt 1983-11-24 Operational isotope production, materials testing, transmutation, neutron capture therapy, training
Arbus (AST-1) Tank 12 MWt 1963-01-01 1988-05-01 Decommissioned
RBT-10/1 Pool 10 MWt 1983-12-01 Decommissioned
MBIR Fast, Power 15 MWt Under construction isotope production, materials testing, transmutation
Source: IAEA Research Reactor Database (RRDB), as of 2026-10-13.

Fuel Cycle Facilities

?
Fuel cycle plants at this site, as listed in the IAEA Nuclear Fuel Cycle Facilities Database: what each plant does, its scale and design capacity, the years it operated, its current status and who operates it.
2 facilities: 2 in operation.
Facility Type Scale Design Capacity Operated Status Operator
RIAR (Research Institute of Atomic Reactors) Spent Fuel Reprocessing - aqueous route Pilot plant 1 t HM/year 1965– In Operation V I Lenin Research Institute of Nuclear Reactors (Niiar)
RIAR (Research Institute of Atomic Reactors) MOX fuel fabrication (Mox Powder, Pellet, Pin, FA) Pilot plant 1 t HM/year 1975– In Operation MINING AND CHEMICAL COMPLEX
Source: IAEA Nuclear Fuel Cycle Facilities Database (NFCFDB), as of 2026-10-13.

Working Here

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$173
Lodging/Night
$112
M&IE/Day
$285
Total/Day
Russia: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Dimitrovgrad, Ulyanovsk Oblast, Russia
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Research Institute of Atomic Reactors; Wikipedia: BOR-60; Nuclear Engineering International: RIAR.

The Research Institute of Atomic Reactors (RIAR) is a nuclear research center in Dimitrovgrad, Ulyanovsk Oblast, Russia. The institute was founded in 1956, although some sources give 1954 or 1958, and its reactors have included the SM, MIR, BOR-60 and VK-50.

Read more

The SM reactor was commissioned in October 1961 and reached its design power of 50 megawatts that autumn. A core enlargement in 1965 raised its power to 75 megawatts. The VK-50 boiling water reactor had its physical startup in December 1964 and its power startup in October 1965. The MIR channel-type reactor began operation in December 1966. Construction of the BOR-60 sodium-cooled fast reactor began in 1964, and it reached first criticality in 1968 and was commissioned in 1969.