Gentilly

Becancour, QC·CANDU

Community ratings, technical specifications, photos, nearby jobs, satellite map, and per diem rates for Gentilly.

Reactor Data

Reactor Units

?
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
2 units: 2 permanent shutdown.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
Gentilly 1 HWLWR HW BLWR 250 250 1966-09-01 1971-04-05 1972-05-01 1977-06-01 Permanent Shutdown
Gentilly 2 PHWR CANDU 6 635 1974-04-01 1982-12-04 1983-10-01 2012-12-28 Permanent Shutdown
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
Gentilly 1 250 266 792 1970-11-12 ATOMIC ENERGY OF CANADA, LTD.
Gentilly 2 645 675 2,156 1982-09-11 ATOMIC ENERGY OF CANADA, LTD. BROWN BOVERI ET CIE
Lifetime performance, through 2025
Unit Electricity Supplied Load Factor Energy Availability Operating Factor
Gentilly 1 0.8 TWh 4.8% 4.8% 6.6%
Gentilly 2 124.2 TWh 76.3% 79.3% 81.2%
Operator: HYDRO QUEBEC
Owner: Canadian Nuclear Laboratories Limited; HYDRO QUEBEC
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-14.

Fuel Cycle Facilities

?
Fuel cycle plants at this site, as listed in the IAEA Nuclear Fuel Cycle Facilities Database: what each plant does, its scale and design capacity, the years it operated, its current status and who operates it.
2 facilities: 1 in operation, 1 shutdown.
Facility Type Scale Design Capacity Operated Status Operator
Gentilly 2 NPP Site AFR Dry Spent Fuel Storage Commercial 2518 t HM 1995– In Operation Hydro-Quebec
Gentilly 1 NPP Site AFR Dry Spent Fuel Storage Commercial 0 t HM 1985–2025 Shutdown Atomic Energy of Canada Ltd (AECL)
Source: IAEA Nuclear Fuel Cycle Facilities Database (NFCFDB), as of 2026-10-13.

Working Here

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$167
Lodging/Night
$120
M&IE/Day
$287
Total/Day
Canada: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Becancour, QC G9A5Z5, Canada
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Gentilly Nuclear Generating Station.

Gentilly is a nuclear power station site at Bécancour, Quebec, on the St. Lawrence River.

Read more

The site had two reactors. Gentilly 1 was a prototype CANDU-BWR rated at 250 MWe, with vertical pressure tubes and light-water coolant. It was connected to the grid on 5 April 1971 and shut down on 1 June 1977 after a record of technical problems. Gentilly 2 is a CANDU 6 heavy-water reactor supplied by Atomic Energy of Canada Limited. Construction began in 1973, and it was connected to the grid on 4 December 1982 and commissioned on 1 October 1983. It was shut down on 28 December 2012, after a planned refurbishment was cancelled in October 2012.

Technical Specs

?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Reactor Type: CANDU