Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
2 units: 2 under construction.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
Jinqimen 1 PWR HPR1000 1,145 2025-08-10 Under Construction
Jinqimen 2 PWR HPR1000 1,145 2026-04-04 Under Construction
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
Jinqimen 1 1,145 1,233 3,190 Nuclear Power Institute of China Dongfang Electric Corporation
Jinqimen 2 1,145 1,230 3,190 Nuclear Power Institute of China Dongfang Electric Corporation
Operator: CHINA NATIONAL NUCLEAR CORPORATION; CNNC (Xiangshan) Nuclear Energy Co., Ltd.
Owner: CHINA NATIONAL NUCLEAR CORPORATION; CNNC (Xiangshan) Nuclear Energy Co., Ltd.
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-19.

Working Here

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$170
Lodging/Night
$98
M&IE/Day
$268
Total/Day
China: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Hepu, Zhejiang, China
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: World Nuclear News: Construction of second Jinqimen unit begins.

Jinqimen is a nuclear power plant site in Ningbo, Zhejiang Province, China.

Read more

China's State Council approved the first phase of two Hualong One (HPR1000) pressurized water reactors on 29 December 2023. A groundbreaking ceremony followed in February 2024. First concrete for the reactor building foundation of Unit 1 was poured on 10 August 2025, and first concrete for the Unit 2 nuclear island was poured on 4 April 2026.