Reactor Data

Reactor Units

?
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
4 units: 4 operational. Net capacity in service: 1,664 MWe.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
Kakrapar 1 PHWR Horizontal Pressure Tube type 202 1984-12-01 1992-11-24 1993-05-06 Operational
Kakrapar 2 PHWR Horizontal Pressure Tube type 202 1985-04-01 1995-03-04 1995-09-01 Operational
Kakrapar 3 PHWR PHWR-700 630 2010-11-22 2021-01-10 2023-06-30 Operational
Kakrapar 4 PHWR PHWR-700 630 2010-11-22 2024-02-20 2024-03-31 Operational
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
Kakrapar 1 202 220 801 1992-09-03 NUCLEAR POWER CORPORATION OF INDIA, LTD. Vikram Sarabhai Bhavan, Anushakti Nagar, Mumbai - 400 094. Bharat Heavy Electricals Ltd (BHEL) www.bhel.com
Kakrapar 2 202 220 801 1995-01-08 NUCLEAR POWER CORPORATION OF INDIA, LTD. Vikram Sarabhai Bhavan, Anushakti Nagar, Mumbai - 400 094. Bharat Heavy Electricals Ltd (BHEL) www.bhel.com
Kakrapar 3 630 700 2,166 2020-07-22 NUCLEAR POWER CORPORATION OF INDIA, LTD. Vikram Sarabhai Bhavan, Anushakti Nagar, Mumbai - 400 094. Bharat Heavy Electricals Ltd (BHEL) www.bhel.com
Kakrapar 4 630 700 2,166 2023-12-17 NUCLEAR POWER CORPORATION OF INDIA, LTD. Vikram Sarabhai Bhavan, Anushakti Nagar, Mumbai - 400 094. Bharat Heavy Electricals Ltd (BHEL) www.bhel.com
Lifetime performance, through 2025
Unit Electricity Supplied Load Factor Energy Availability Operating Factor
Kakrapar 1 36.2 TWh 63.0% 65.2% 69.2%
Kakrapar 2 37.9 TWh 70.6% 72.8% 80.3%
Kakrapar 3 11.6 TWh 78.1% 78.7% 84.5%
Kakrapar 4 6.9 TWh 70.9% 71.8% 83.6%
Operator: NUCLEAR POWER CORPORATION OF INDIA, LTD.
Owner: NUCLEAR POWER CORPORATION OF INDIA, LTD.
Source: IAEA Power Reactor Information System (PRIS), as of 2026-11-02.

Working Here

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$196
Lodging/Night
$92
M&IE/Day
$288
Total/Day
India: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Mandvi, Gujarat, India
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Kakrapar Atomic Power Station.

Kakrapar Atomic Power Station is a nuclear power plant on the Tapi River in Gujarat, India, near Mandvi and Surat.

Read more

Construction of the first two units, 220 MW pressurized heavy water reactors of Indian design, began on 1 December 1984 and 1 April 1985. Unit 1 was connected to the grid on 24 November 1992 and Unit 2 on 4 March 1995. Two larger 700 MW units of the same reactor family were started on 22 November 2010. Unit 3 was grid-connected on 10 January 2021 and Unit 4 on 20 February 2024.