Novovoronezhskiy
Reactor Data
Reactor Units
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
7 units: 4 operational, 3 permanent shutdown.
Net capacity in service: 3,536 MWe.
| Unit | Type | Model | Net MWe | Construction | Grid | Commercial Op | Shutdown | Status |
|---|---|---|---|---|---|---|---|---|
| Novovoronezh 1 | PWR | VVER V-210 | 197 | 1957-07-01 | 1964-09-30 | 1964-12-29 | 1984-08-06 | Permanent Shutdown |
| Novovoronezh 2 | PWR | VVER V-365 | 336 | 1964-06-01 | 1969-12-27 | 1970-04-14 | 1990-01-23 | Permanent Shutdown |
| Novovoronezh 3 | PWR | VVER V-179 | 385 | 1967-07-01 | 1971-12-27 | 1972-06-29 | 2016-12-25 | Permanent Shutdown |
| Novovoronezh 4 | PWR | VVER V-179 | 385 | 1967-07-01 | 1972-12-28 | 1973-03-24 | Operational | |
| Novovoronezh 5 | PWR | VVER V-187 | 950 | 1974-03-01 | 1980-05-31 | 1981-02-20 | Operational | |
| Novovoronezh 2-1 | PWR | VVER V-392M | 1,100 | 2008-06-24 | 2016-08-05 | 2017-02-27 | Operational | |
| Novovoronezh 2-2 | PWR | VVER V-392M | 1,101 | 2009-07-12 | 2019-05-01 | 2019-10-31 | Operational |
Capacity, milestones and suppliers
| Unit | Design MWe | Gross MWe | Thermal MWt | First Criticality | Reactor Supplier | Turbine Supplier | Notes |
|---|---|---|---|---|---|---|---|
| Novovoronezh 1 | 197 | 210 | 760 | 1963-12-17 | MINISTRY OF MEDIUM MACHINE BUILDING OF THE USSR (MINSREDMASH) | Kharkiv Turbine Factory | Decommissioning from 2013-10-25 |
| Novovoronezh 2 | 336 | 365 | 1,320 | 1969-12-23 | MINISTRY OF MEDIUM MACHINE BUILDING OF THE USSR (MINSREDMASH) | Kharkiv Turbine Factory | Decommissioning from 2013-10-25 |
| Novovoronezh 3 | 385 | 417 | 1,375 | 1971-12-22 | Atomenergomash | Kharkiv Turbine Factory | |
| Novovoronezh 4 | 385 | 417 | 1,375 | 1972-12-25 | Atomenergomash | Kharkiv Turbine Factory | |
| Novovoronezh 5 | 950 | 1,000 | 3,000 | 1980-04-30 | Atomenergomash | Kharkiv Turbine Factory | |
| Novovoronezh 2-1 | 1,114 | 1,180 | 3,200 | 2016-05-20 | Atomenergomash | Atomenergomash | |
| Novovoronezh 2-2 | 1,114 | 1,181 | 3,200 | 2019-03-22 | Atomenergomash | Atomenergomash |
Lifetime performance, through 2025
| Unit | Electricity Supplied | Load Factor | Energy Availability | Operating Factor |
|---|---|---|---|---|
| Novovoronezh 2 | 49.9 TWh | 72.2% | 78.8% | 84.2% |
| Novovoronezh 3 | 109.3 TWh | 72.1% | 72.6% | 80.3% |
| Novovoronezh 4 | 140.5 TWh | 78.5% | 78.6% | 83.0% |
| Novovoronezh 5 | 249.3 TWh | 68.2% | 68.4% | 75.0% |
| Novovoronezh 2-1 | 68.0 TWh | 77.8% | 78.9% | 83.3% |
| Novovoronezh 2-2 | 51.2 TWh | 82.3% | 82.8% | 85.6% |
Operator: Joint Stock Company 'Concern Rosenergoatom'
Owner: MINISTRY OF MEDIUM MACHINE BUILDING OF THE USSR (MINSREDMASH); Joint Stock Company 'Concern Rosenergoatom'
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-14.
Fuel Cycle Facilities
Fuel cycle plants at this site, as listed in the IAEA Nuclear Fuel Cycle Facilities Database: what each plant does, its scale and design capacity, the years it operated, its current status and who operates it.
1 facility: 1 in operation.
| Facility | Type | Scale | Design Capacity | Operated | Status | Operator |
|---|---|---|---|---|---|---|
| Novovoronezh NPP Site | AFR Wet Spent Fuel Storage (Pool) | Commercial | 400 t HM | 1986– | In Operation | Rosenergoatom, Consortium |
Source: IAEA Nuclear Fuel Cycle Facilities Database (NFCFDB), as of 2026-10-13.
Working Here
Per Diem Rates FY 2026
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$173
Lodging/Night
$112
M&IE/Day
$285
Total/Day
Russia: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.
Photos
Photos of this facility from the NukeWorker photo gallery. Click the header or any photo to browse the full album.
Facility Map
Interactive satellite map showing the facility's geographic location. Marker color indicates current status: green for online, red for offline, orange for reduced power. Click the header to open in Google Maps satellite view.
51.2703, 39.2009
Location & Contact
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Plant Facts
About This Site
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Novovoronezh Nuclear Power Plant; IAEA PRIS: Russian Federation.
The Novovoronezh nuclear power plant is on the Don River, near the town of Novovoronezh in Voronezh Oblast, Russia. Its early units were prototypes of successive VVER pressurized water reactor designs.
Read more
Construction of Unit 1 began on July 1, 1957. Unit 1 (VVER-210) was connected to the grid on September 30, 1964, Unit 2 (VVER-365) on December 27, 1969, and Unit 3 (VVER-440) on December 27, 1971. Unit 4 followed on December 28, 1972, and Unit 5, a VVER-1000 prototype, on May 31, 1980. Units 1 and 2 were permanently shut down in 1984 and 1990, and Unit 3 on December 25, 2016. Two newer units of Novovoronezh II were connected to the grid in 2016 and 2019.