3 units: 1 operational, 2 permanent shutdown. Net capacity in service: 1,400 MWe.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
Oskarshamn 1 BWR AA-I 473 1966-08-01 1971-08-19 1972-02-06 2017-06-19 Permanent Shutdown
Oskarshamn 2 BWR AA-II 638 1969-09-01 1974-10-02 1975-01-01 2016-12-22 Permanent Shutdown
Oskarshamn 3 BWR AA-IV, BWR-3000 1,400 1980-05-01 1985-03-03 1985-08-15 Operational
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
Oskarshamn 1 440 492 1,375 1970-12-12 ABB ATOM (formerly ASEA-ATOM) STAL-LAVAL
Oskarshamn 2 580 661 1,800 1974-03-06 ABB ATOM (formerly ASEA-ATOM) STAL-LAVAL
Oskarshamn 3 1,050 1,450 3,900 1984-12-29 ABB ATOM (formerly ASEA-ATOM) STAL-LAVAL
Lifetime performance, through 2025
Unit Electricity Supplied Load Factor Energy Availability Operating Factor
Oskarshamn 1 110.3 TWh 61.3% 62.3% 65.0%
Oskarshamn 2 154.0 TWh 69.6% 72.6% 75.8%
Oskarshamn 3 341.0 TWh 77.5% 80.0% 84.1%
Operator: OKG AKTIEBOLAG
Owner: OKG AKTIEBOLAG
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-19.

Fuel Cycle Facilities

?
Fuel cycle plants at this site, as listed in the IAEA Nuclear Fuel Cycle Facilities Database: what each plant does, its scale and design capacity, the years it operated, its current status and who operates it.
1 facility: 1 in operation.
Facility Type Scale Design Capacity Operated Status Operator
Clab ISF AFR Wet Spent Fuel Storage (Pool) Commercial 8000 t HM 1985– In Operation Swedish Nuclear Fuel and Waste Management Company (SKB)
Source: IAEA Nuclear Fuel Cycle Facilities Database (NFCFDB), as of 2026-10-13.

Working Here

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$293
Lodging/Night
$155
M&IE/Day
$448
Total/Day
Sweden: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Oskarshamn, Kalmar County, Sweden
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Oskarshamn Nuclear Power Plant; IAEA PRIS: Sweden.

The Oskarshamn nuclear power plant is on the Baltic Sea coast at Simpevarp, about 25 km north of the town of Oskarshamn, in Kalmar County, Sweden. All three units are boiling water reactors.

Read more

Construction began in 1965. Unit 1 was connected to the grid on August 19, 1971, Unit 2 on October 2, 1974, and Unit 3 on March 3, 1985. On September 23, 2003, a shutdown of Unit 3 contributed to a power outage in southern Sweden and eastern Denmark. Unit 2 was permanently shut down in December 2016 and Unit 1 on June 19, 2017.