Peach Bottom 1

SAFSTOR

Constellation Energy·Delta, PA·HTGR·40 MWe

Community ratings, technical specifications, photos, nearby jobs, satellite map, contact information, and per diem rates for Peach Bottom 1.

SAFSTOR

Permanently shut down on 1974-11-01.

Reactor Data

Reactor Units

?
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
1 unit: 1 permanent shutdown.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
Peach Bottom 1 HTGR 40 1962-02-01 1967-01-27 1967-06-01 1974-11-01 Permanent Shutdown
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
Peach Bottom 1 40 42 115 1966-03-03 GENERAL ATOMIC CORP.
Lifetime performance, through 2025
Unit Electricity Supplied Load Factor Energy Availability Operating Factor
Peach Bottom 1 1.4 TWh 54.3% 73.5% 68.0%
Operator: Exelon Generation Co., LLC
Owner: Exelon Generation Co., LLC
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-19.

Working Here

Per Diem Rates FY 2027

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from GSA for FY 2027.
$125
Lodging/Night
$74
M&IE/Day
$199
Total/Day
Lancaster, Lancaster County, PA

Unemployment Benefits PA

?
Maximum state unemployment insurance benefits for PA. Actual benefits depend on your earnings history and may be lower than the maximum. Data as of Jan 2026.
$605
Max Weekly
26
Max Weeks
$15,730
Max Total
7-day waiting period before benefits begin

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
1848 Lay Road
Delta, PA 17563, USA
Get Directions
Phone: (717) 456-7014

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Peach Bottom Nuclear Generating Station.

Peach Bottom Atomic Power Station is in Peach Bottom Township, York County, Pennsylvania, near Delta and about three miles north of the Maryland border. It draws its cooling water from the Susquehanna River.

Read more

Philadelphia Electric Company ordered Unit 1, a General Atomics high-temperature gas-cooled prototype reactor, in 1958. Construction began on February 1, 1962, the unit connected to the grid on January 27, 1967, and it was shut down on November 1, 1974. Units 2 and 3 are General Electric BWR-4 boiling water reactors. Construction began on January 31, 1968, and they entered commercial operation on July 5, 1974 and December 23, 1974.

Ownership & Construction

?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Owner/Operator: Constellation Energy
CEG Constellation Energy Corporation NasdaqGS
$263.19 ▼ -8.18 (-3.01%)
Previous Close 271.37
Day's Range 261.93 – 277.21
52-Week Range 228.63 – 406.04
Volume 3,671,218
Delayed quote as of Oct 19, 2026 4:00 PM ET. Source: Yahoo Finance. Full quote on Yahoo Finance

Technical Specs

?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Reactor Type: HTGR
NSS Supplier: GA
Net Capacity: 40 MWe
Status: SAFSTOR

Licensing

?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Const. Permit: 1962-02-01
Operating Lic: 1967-01-27
Commercial Op: 1967-06-01