Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
Active nuclear industry job listings in PA from the NukeWorker job board. Click a job title for full details, or click the header to search all jobs in this state.
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from GSA for FY 2027.
Maximum state unemployment insurance benefits for PA. Actual benefits depend on your earnings history and may be lower than the maximum. Data as of Jan 2026.
Interactive satellite map showing the facility's geographic location. Marker color indicates current status: green for online, red for offline, orange for reduced power. Click the header to open in Google Maps satellite view.
39.759, -76.2685
Location & Contact
?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Community ratings from NukeWorker members. Vote to share your experience working at this facility. Score uses a Bayesian average that accounts for vote count — facilities with few votes are pulled toward the fleet average, so rankings reflect confidence, not just raw percentages.
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Peach Bottom Nuclear Generating Station.
Peach Bottom Atomic Power Station is in Peach Bottom Township, York County, Pennsylvania, near Delta and about three miles north of the Maryland border. It draws its cooling water from the Susquehanna River.
Read more
Philadelphia Electric Company ordered Unit 1, a General Atomics high-temperature gas-cooled prototype reactor, in 1958. Construction began on February 1, 1962, the unit connected to the grid on January 27, 1967, and it was shut down on November 1, 1974. Units 2 and 3 are General Electric BWR-4 boiling water reactors. Construction began on January 31, 1968, and they entered commercial operation on July 5, 1974 and December 23, 1974.
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.