Reactor Data

Reactor Units

?
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
4 units: 2 operational, 2 under construction. Net capacity in service: 2,232 MWe.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
Taipingling 3 PWR HPR1000 1,209 2025-06-10 Under Construction
Taipingling 1 PWR HPR1000 1,116 2019-12-26 2026-02-13 2026-04-19 Operational
Taipingling 4 PWR HPR1000 1,209 2026-05-10 Under Construction
Taipingling 2 PWR HPR1000 1,116 2020-10-15 2026-07-04 2026-08-03 Operational
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
Taipingling 3 1,209 1,209 3,180 China First Heavy Industries HARBIN TURBINE COMPANY LIMITED
Taipingling 1 1,116 1,202 3,190 2026-02-03 Dongfang Electric Corporation Dongfang Electric Corporation
Taipingling 4 1,209 1,209 3,180 Dongfang Electric Corporation HARBIN TURBINE COMPANY LIMITED
Taipingling 2 1,116 1,202 3,190 2026-06-25 China First Heavy Industries Dongfang Electric Corporation Grid 2026-07-04 and commercial operation 2026-08-03 per CGN (Xinhua, China Daily); not yet in IAEA PRIS
Operator: CGN Huizhou Second Nuclear Power Co., Ltd; CGN Huizhou Nuclear Power Co.,Ltd,
Owner: CGN Huizhou Second Nuclear Power Co., Ltd; CGN Huizhou Nuclear Power Co.,Ltd,
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-19.

Working Here

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$170
Lodging/Night
$98
M&IE/Day
$268
Total/Day
China: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Huizhou, Guangdong, China
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Taipingling Nuclear Power Plant.

Taipingling is a nuclear power plant site in Huangbu Town, Huidong County, Huizhou, Guangdong Province, China.

Read more

The project was approved in February 2019. CGN originally planned AP1000 units but changed to the Hualong One pressurized water reactor design. Construction began on Unit 1 on 26 December 2019, Unit 2 on 15 October 2020, Unit 3 on 10 June 2025 and Unit 4 on 10 May 2026. Unit 1 was connected to the grid on 13 February 2026 and Unit 2 on 4 July 2026.