Volgodonsk

Technical specifications, photos, nearby jobs, and satellite map for Volgodonsk.

Reactor Data

Reactor Units

?
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
4 units: 4 operational. Net capacity in service: 3,868 MWe.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
Rostov 1 PWR VVER V-320 989 1981-09-01 2001-03-30 2001-12-25 Operational
Rostov 2 PWR VVER V-320 950 1983-05-01 2010-03-18 2010-12-10 Operational
Rostov 3 PWR VVER V-320 950 2009-09-15 2014-12-27 2015-09-17 Operational
Rostov 4 PWR VVER V-320 979 2010-06-16 2018-02-02 2018-09-28 Operational
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
Rostov 1 950 1,042 3,200 2001-02-23 Atomenergomash Kharkiv Turbine Factory
Rostov 2 950 1,000 3,120 2010-01-22 Atomenergomash Federal Atomic Energy Agency
Rostov 3 950 1,000 3,120 2014-12-07 Atomenergomash Atomenergomash
Rostov 4 950 1,030 3,120 2017-12-29 Atomenergomash Atomenergomash
Lifetime performance, through 2025
Unit Electricity Supplied Load Factor Energy Availability Operating Factor
Rostov 1 188.1 TWh 91.4% 88.5% 89.1%
Rostov 2 121.6 TWh 93.9% 90.0% 90.6%
Rostov 3 79.0 TWh 89.1% 86.3% 87.7%
Rostov 4 59.5 TWh 90.2% 90.0% 92.2%
Operator: Joint Stock Company 'Concern Rosenergoatom'
Owner: Joint Stock Company 'Concern Rosenergoatom'
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-19.

Working Here

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$173
Lodging/Night
$112
M&IE/Day
$285
Total/Day
Russia: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Volgodonsk, Rostov Oblast, Russia
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Rostov Nuclear Power Plant; IAEA PRIS: Russian Federation.

Volgodonsk is the town beside the Rostov nuclear power plant, in Rostov Oblast, Russia. The plant is on the left bank of the Tsimlyansk Reservoir on the lower Don River. It has four VVER-1000/320 pressurized water reactors.

Read more

Unit 1 was connected to the grid on March 30, 2001, and entered commercial operation on December 25, 2001. Construction of Unit 2 began on May 1, 1983, and it was connected to the grid on March 18, 2010. Unit 3 began construction on September 15, 2009, and reached the grid on December 27, 2014. Unit 4 began construction on June 16, 2010, and was connected to the grid on February 2, 2018.