Xudapu
Reactor Data
Reactor Units
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
4 units: 4 under construction.
| Unit | Type | Model | Net MWe | Construction | Grid | Commercial Op | Shutdown | Status |
|---|---|---|---|---|---|---|---|---|
| Xudapu 3 | PWR | VVER-1200/V491 | 1,200 | 2021-07-28 | Under Construction | |||
| Xudapu 4 | PWR | VVER-1200/V491 | 1,200 | 2022-05-19 | Under Construction | |||
| Xudapu 1 | PWR | CAP1000 | 1,000 | 2023-11-03 | Under Construction | |||
| Xudapu 2 | PWR | CAP1000 | 1,000 | 2024-07-17 | Under Construction |
Capacity, milestones and suppliers
| Unit | Design MWe | Gross MWe | Thermal MWt | First Criticality | Reactor Supplier | Turbine Supplier | Notes |
|---|---|---|---|---|---|---|---|
| Xudapu 3 | 1,200 | 1,274 | 3,200 | Russian Hydraulic Press Design Institute (OKB) | Shanghai Electric Group | ||
| Xudapu 4 | 1,200 | 1,274 | 3,200 | Atommash AEM-Technologies | Shanghai Electric Group | ||
| Xudapu 1 | 1,000 | 1,290 | 2,905 | Dongfang Electric Corporation | Dongfang Electric Corporation | ||
| Xudapu 2 | 1,000 | 1,290 | 2,905 | Dongfang Electric Corporation | Dongfang Electric Corporation |
Operator: LIAONING NUCLEAR POWER COMPANY, LMT.
Owner: CHINA NATIONAL NUCLEAR CORPORATION
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-19.
Working Here
Per Diem Rates FY 2026
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$170
Lodging/Night
$98
M&IE/Day
$268
Total/Day
China: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.
Facility Map
Interactive satellite map showing the facility's geographic location. Marker color indicates current status: green for online, red for offline, orange for reduced power. Click the header to open in Google Maps satellite view.
40.3498, 120.543
Location & Contact
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Plant Facts
About This Site
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Xudabao Nuclear Power Plant; World Nuclear News: Construction of Xudapu 4 under way.
Xudapu (also spelled Xudabao) is a nuclear power plant site in Xudabao Village, Haibin, Xingcheng, Huludao, on the coast of Liaoning Province, China.
Read more
Preliminary site work began in 2010 and stopped for several years after the 2011 Fukushima accident. China's nuclear safety regulator approved the first two units in 2014. In March 2019 CNNC and Atomstroyexport signed the detailed contract for two VVER-1200 reactors, Units 3 and 4, and construction began on 28 July 2021 and 19 May 2022. Construction of the CAP1000 Units 1 and 2 began on 3 November 2023 and 17 July 2024.