This is only an observation. Outages are staffing RPT at least 20% or more short. There is little time for the tech to perform job coverage, count smears and document the survey. You can spend 8-10 hrs. in containment or drywell covering multiple jobs because You are the only 3.1 to cover a high risk job (HCA, LHRA, DLHRA, L3 alpha). You can spend the extra overtime writing the survey, but it cuts into your rest/sleep cycle. And RP supervision does not recognize the problem. Even if they do, most RPMs do not have the guts to stand up to Ops or OCC to get more help for the outage or adjust the schedule to not burn out the techs. Heaven forbid if you delay critical path work taking a 15 min. lunch (some plants automatically deduct for a 30 min. lunch - saves 3 hrs. of overtime pay per week) or bathroom break (Depends to be issued with scrubs). Training has been shortened to 2-3 days (CBT) and less than a day on plant RP procedures. Before the trolls chime in, Jr's count smears - there are no Jr's, or you don't need to document the survey - by all plant procedures, the RCT must document all job coverage that is not routine. More of my fellow 3.1 techs have died during outage this year than ever before. I have notice more techs falling out (heat exhaustion) than usual. Understaffed and overworked??? I know the 3.1 tech avg. age is 50+. Corporations do not seem to understand that assets should not be overworked. The 'fatigue rule' is a joke. Most plants will state 'RATs are exempt' and 'Can you work your day off?'. The FR covers ERO personnel only. I'm counting the days to retirement. I do not desire to 'do more with less'. People get hurt or die.