River Bend 1 trips offline, unscheduled outage underway

Started by Core Content, Today at 06:35

Previous topic - Next topic

0 Members and 1 Guest are viewing this topic.

Core Content

River Bend 1, St. Francisville, Louisiana.

River Bend 1 entered an unscheduled outage, reaching 0% power in the NRC daily report of Nov 18, 2026. This event brings the forced-outage count for the unit to 2 so far in 2026, compared to 4 in all of 2025. The next planned refuel for the unit is expected this winter.

ST. FRANCISVILLE, LA. River Bend 1 entered an unscheduled outage and was at 0% power in the NRC's Nov 18, 2026 daily power report. The NRC has not yet issued an event notification for this trip; a follow-up reply will be posted here if one is filed.

This is the second unscheduled outage of 2026 for the unit, which had 4 unscheduled outages in all of 2025. The unit's next scheduled refueling outage is expected this winter.

Across the U.S. fleet of 94 commercial reactors, today's combined capacity factor is 86.6% (7 units currently refueling, 3 units in unscheduled outages), below the 88.0% baseline for this month over the past five years. Browns Ferry 2 also had an unscheduled outage within the past week. While the unit is down, that takes about 774,000 homes' worth of generation off the grid.

River Bend 1 is a 968-MW General Electric BWR/6 operated by Entergy (commercial operation since 1986). The utility operates 4 other U.S. nuclear units at 3 other plants. Its operating license runs through 2045 (renewed in 2018).

View River Bend 1's ratings, history, projections, and current status on NukeWorker. This thread will follow the restart and power ascension. Get a free email alert the moment it comes back online.

Want the full picture? Subscribe to the NukeWorker outage schedule for every current and upcoming U.S. nuclear outage.

Sources: NRC Daily Reactor Power Status reports, validated outage schedules, and NukeWorker's projections.