NukeWorker.com: Nuclear Jobs, Resumes, Outage Schedules, & RCT Training

NukeWorker Menu

Nuclear Pictures

NukeWorker online photo album.

An Iron Worker Installs Rebar at Valve House 7.
A balanced approach to waste disposition has been developed at Fernald, one in which the majority of the site's contaminated material will be placed in an On-Site Disposal Facility (OSDF) for its final disposition, where as, a smaller volume of more highly contaminated waste will be sent off site. The OSDF is being constructed on the east side of the Fernald Site and will ulimately hold approximately 2.5 million cubic yards of impacted material. The facility is being constructed in phases. Phase V consists of waste placement in Cells 3, 4, 5 and 6, construction of the Cell 7 and 8 liners, the placement of the final cover on all remaining cells and screening of clay liner and cover material in the Borrow Area. 
Keywords: Fernald Closure Project Fernald Green Salt Plant, Feed Materials Production Center, Fernald, Ohio (FEMP)

An Iron Worker Installs Rebar at Valve House 7.

A balanced approach to waste disposition has been developed at Fernald, one in which the majority of the site's contaminated material will be placed in an On-Site Disposal Facility (OSDF) for its final disposition, where as, a smaller volume of more highly contaminated waste will be sent off site. The OSDF is being constructed on the east side of the Fernald Site and will ulimately hold approximately 2.5 million cubic yards of impacted material. The facility is being constructed in phases. Phase V consists of waste placement in Cells 3, 4, 5 and 6, construction of the Cell 7 and 8 liners, the placement of the final cover on all remaining cells and screening of clay liner and cover material in the Borrow Area.

2002707.jpg ad7817bb4961a56f1a775372.medium.jpg 2008888.jpg 2003308.jpg lakeview.gif
File information
Filename:fernald_cells_2.jpg
Album name:Rennhack / Fernald (FEMP)
Keywords:Fernald / Closure / Project / Fernald / Green / Salt / Plant, / Feed / Materials / Production / Center, / Fernald, / Ohio / (FEMP)
Date:Apr-30-2004
Credits:DOE Photo
Filesize:57 KiB
Date added:Oct 30, 2005
Dimensions:288 x 192 pixels
Displayed:1206 times
URL:https://www.nukeworker.com/pictures/displayimage.php?pid=3976
Favorites:Add to Favorites