NukeWorker.com: Nuclear Jobs, Resumes, Outage Schedules, & RCT Training

NukeWorker Menu

Most viewed - Plants 2, 3 and 8 After Demolition.

Plants 2, 3 and 8 After Demolition.
Plant 8, the Scrap Recovery Plant, recycled residues and scrap from the uranium production process. Ores, concentrates and process residues were roosted to oxidize the impurities and then filtered. The filtered material was converted to free flowing powder and transferred to Plant 2 for further processing. The D&D of the plants consists of surface decontamination, building and equipment dismantlement, size reduction of building material and the loading of demolition debris into rolloff boxes for transfer on the On-Site Disposal Facility. 
Keywords: Fernald Closure Project Fernald Green Salt Plant, Feed Materials Production Center, Fernald, Ohio (FEMP)
Filename fernald_DnD_7.jpg
Album name Rennhack / Fernald (FEMP)
Date Mar-31-2004
Credits DOE Photo
Filesize 51 KiB
Date added Oct 30, 2005
Dimensions 288 x 192 pixels
Displayed 1109 times
Favorites Add to Favorites