Workers Finish Installing a Bridge Crane in the Silos 1 and 2 Treatment Facility that will be used to Load the Waste Containers for Transportation Off Site.Oct 30, 2005
Workers are Trained to Seal the Soft-Sided Packages that will be used for the Silo 3 Waste.Oct 30, 2005
Work Continues in the Three Product Fill Rooms where the Casks will be Filled Robotically with the K-65 Stabilized Waste.Oct 30, 2005
Analytical Lab Decontamination and Demolition Project - An Operating Engineer uses Grapplers to Segregate Demolition Debris that Needs Further Size Reducing from that which can be Immediately Loaded for Transfer to the On-Site Disposal Facility (OSDF).Oct 30, 2005
An Operating Engineer Loads Building Debris into an Articulation Dump Truck on the Pad of the Lab Building.Oct 30, 2005
Operating Engineers Topple the Last Section of Plant 8 by Pushing the Structure to the Ground.Oct 30, 2005
The Bio-Dentrification Tower and Plants 2 and 3 After Demolition. Excavation Crews are Now Removing the Below-Grade Portions of the Structures.Oct 30, 2005
Workers Remove Transite Panels from the Pilot Plant in Preparation for the Demolition of the Concrete Structure.Oct 30, 2005
Operating Engineers use Grapplers and Bulldozers to Place and Compact Demolition Debris in Cell 4 of the On-Site Disposal Facility (OSDF).Oct 30, 2005