NukeWorker.com: Nuclear Jobs, Resumes, Outage Schedules, & RCT Training

NukeWorker Menu

Big Rock

The plant shut down on August 30, 1997. Fuel was transferred to the spent fuel pool by September 20, 1997. The owner submitted certification of permanent cessation of operations on June 26, 1997, and certification of permanent fuel removal on September 23, 1997. The owner submitted their decommissioning plan on February 27, 1995 which was considered to be the post-shutdown decommissioning activities report (PSDAR) and has subsequently been updated. The PSDAR public meeting was held on November 13, 1997. The owner selected the DECON option. Under the current schedule, the operating license is planned to be terminated in 2005. The owner has loaded all of the spent fuel from the pool into transportable dry storage systems at an on-site interim storage facility.
20 files on 1 page(s)