Analytical Lab Decontamination and Demolition Project - An Operating Engineer uses Grapplers to Segregate Demolition Debris that Needs Further Size Reducing from that which can be Immediately Loaded for Transfer to the On-Site Disposal Facility (OSDF).424 views
424 views
Koeberg424 views
South-Ukrainian NPP424 views
424 views
424 views
Ambrosia Lake Cell423 views
New Brunswick Site423 views
Painesville Locality Map423 views
423 views
Field Tests are Conducted to Confirm Quality of Riprap at Lakeview, OR, Title 1 Disposal Cell422 views
Beznau422 views
422 views
422 views
422 views
422 views
Annual Slope Stability Inspection at Lakeview, OR, Title 1 Disposal Cell421 views
The mill site is located about 8 miles southwest of Falls City in Karnes County, Texas.421 views
PLANT 1 - One of many structures associated with the Sampling Plant.421 views
421 views
421 views
420 views
420 views
420 views
420 views
Ambrosia Lake Map419 views
Typical vegetation growth found on the side slopes of the Falls City disposal cell.419 views
419 views
419 views
419 views
419 views
A Supervisor Gives Instructions to an Operating Engineer in Pit 3.418 views
Koeberg418 views
South-Ukrainian NPP418 views
418 views
418 views
418 views
418 views
418 views
417 views
417 views
Silo 3 Treatment Facility417 views
Workers Finish Installing a Bridge Crane in the Silos 1 and 2 Treatment Facility that will be used to Load the Waste Containers for Transportation Off Site.417 views
417 views
417 views
416 views
416 views
Fernald Environmental Project (FEMP)415 views
Operating Engineers Cover Demolition Debris from the Analytical Laboratory with Impacted Soil in Cell 4 of the On-Site Disposal Facility.415 views
Operating Engineers Topple the Last Section of Plant 8 by Pushing the Structure to the Ground.415 views