Breaker-to-Breaker Runs
8 runs
?
Breaker-to-breaker runs measure continuous operation between refueling outages using a cycle-adjusted threshold (90% of cycle length minus RFO duration). An active streak means the unit has been running continuously since the last refueling with no trips to 0% power.
Comanche Peak 1 has logged 8 breaker-to-breaker runs, continuous stretches from one refueling to the next with no trip to zero power. Its longest ran 531 days, and its runs average 510 days.
531
Best Run (days)
1RF19 (2017-11-07) → 1RF20 (2019-04-22)
★ 5-run breaker-to-breaker
1RF17 → 1RF18 → 1RF19 → 1RF20 → 1RF21 → 1RF22
All Runs
| 2020-11-09 |
2022-04-11 |
518 days |
1RF21 → 1RF22 |
| 2019-05-27 |
2020-10-11 |
503 days |
1RF20 → 1RF21 |
| 2017-11-07 |
2019-04-22 |
531 days |
1RF19 → 1RF20 |
| 2016-06-01 |
2017-10-09 |
495 days |
1RF18 → 1RF19 |
| 2014-11-27 |
2016-05-02 |
522 days |
1RF17 → 1RF18 |
| 2005-11-08 |
2007-02-25 |
474 days |
1RF11 → 1RF12 |
| 2004-05-04 |
2005-10-09 |
523 days |
1RF10 → 1RF11 |
| 1999-10-30 |
2001-03-25 |
512 days |
1RF7 → 1RF8 |
About This Site
?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Comanche Peak Nuclear Power Plant.
Comanche Peak Nuclear Power Plant is a two-unit nuclear station in Somervell County, Texas, near Glen Rose, about 40 miles southwest of Fort Worth.
Read more
Construction began on December 19, 1974, for both units. Each unit has a Westinghouse four-loop pressurized water reactor. Unit 1 was first connected to the grid on April 24, 1990, and entered commercial operation on August 13, 1990. Unit 2 was connected on April 9, 1993, and entered commercial operation on August 3, 1993. In September 2008 the owner applied for a combined license for two additional reactors, but expansion work was suspended by November 2013.
Facility Statistics
?
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
Comanche Peak 1 has operated for about 36.2 years and averaged a 92.6% lifetime capacity factor, generating roughly 275.2 TWh of electricity. Its longest unbroken run reached 535 days.
Lifecycle & Tenure
Operating Age: 36.2 Yrs
Build Time: 15.6 Yrs
Lic. Remaining: 23.3 Yrs
Production & Power
Lifetime CF: 92.6%
Efficiency: 33.5%
Generated: 275.2 TWh
Reliability & Outages
Record Run: 535 Days
Refuelings: 19
Avg Startup: 5.9 Days
Ownership & Construction
?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Ownership, operation and management history
| Date | Change |
From | To |
| Oct 10, 2007 |
Buyout |
TXU |
Luminant (Energy Future Holdings) |
| Oct 3, 2016 |
Spin-off |
Luminant (Energy Future Holdings) |
Vistra Energy |
VST
Vistra Corp.
NYSE
$138.37
▼ -2.58 (-1.83%)
Previous Close
140.95
Day's Range
135.86 – 139.82
52-Week Range
132.66 – 196.80
Volume
5,264,572
Operational Excellence Score Subscribers
Comanche Peak 1 is rated 0 to 100 on how well it actually runs, scored against every other operating reactor in the US fleet from its own operating record. Subscribers see the score, the three sub-scores behind it, and each of the seven measured inputs.
- This unit's composite score and fleet rank
- Reliability, Efficiency and Discipline sub-scores
- All seven measured inputs, with fleet percentiles
- Rank against comparable units, not just the fleet
- Three-year, five-year and lifetime windows
- Five-year trend, and every other operating US reactor
Scram History
5 events since 2011
?
Automatic and manual reactor scram (emergency shutdown) events reported to the NRC since 2011. Includes event dates, trip type, and average recovery time. Click the title to view the full fleet scram dashboard.
Comanche Peak 1 has recorded 5 reactor scrams, or emergency shutdowns, since 2011 (3 automatic, 2 manual). On average the unit was back to full power about 9.4 days after each trip.
Recent Events
| 2025-09-24 |
Manual |
MANUAL REACTOR TRIP The following information was provided b... |
|
| 2023-06-16 |
Auto |
AUTOMATIC REACTOR TRIP DUE TO LO-LO STEAM GENERATOR LEVEL Th... |
|
| 2022-09-05 |
Auto |
AUTOMATIC REACTOR TRIP DUE TO TURBINE TRIP The following inf... |
|
| 2014-01-18 |
Auto |
REACTOR TRIP DUE TO TURBINE TRIP "At 0840 [CST], Comanche Pe... |
|
| 2012-11-02 |
Manual |
MANUAL REACTOR TRIP DUE TO HIGH REACTOR COOLANT PUMP MOTOR B... |
|
Technical Specs
?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Turbine Supplier:
ALLIS CHALMERS IAEA
Thermal Power:
3612 MWt
Net Capacity:
1209 MWe
Gross Capacity:
1,259 MWe IAEA
Design Capacity:
1,150 MWe IAEA
Efficiency:
33.5%
Lifetime Output:
325.3 TWh through 2025 IAEA
Licensing
?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #:
05000445
License #:
NPF-87
License Type:
OL-FP
Const. Permit:
1974-12-19
Construction Start:
1974-12-19 IAEA
Operating Lic:
1990-04-17
First Criticality:
1990-04-03 IAEA
Grid Connection:
1990-04-24 IAEA
Commercial Op:
1990-08-13
License Renewed:
2024-07-30
License Exp:
2050-02-08
Market & Region
?
EIA market and grid-region classifications: NERC reliability region, U.S. Census region, balancing authority responsible for grid operations, and whether the unit operates as a rate-regulated utility or a competitive merchant generator. Hover any value for the full name.
NERC Region:
TRE
— Texas Regional Entity
Census Region:
WSC
— West South Central
Balancing Authority:
ERCO
— Electric Reliability Council of Texas (ERCOT) (ISO/RTO)
Market Structure:
Merchant
— Competitive generator selling into wholesale markets