Hatch 2 — Nuclear Reactor Data & Live Status

Live reactor status, daily power data, outage history & performance charts, scram history, capacity factor & statistics, community ratings, technical specifications, NRC licensing data, photos, nearby jobs, satellite map, contact information, and per diem rates for Hatch 2.

?
Composite Operational Excellence Score (0-100) — average percentile rank across 7 dimensions in three sub-scores: Reliability (capacity factor, forced outage days, B2B avg streak), Efficiency (fuel utilization, refuel duration), and Discipline (startup duration, scram count). 5-year window. Higher = more operationally excellent. Click to see the full breakdown.
   
Excellence
ranked of 93
Subscribers
?
Current reactor power level from the most recent NRC daily report.
100%
Power
ONLINE
?
Days of continuous operation since the last outage ended. Ranked against all operating units.
117
Current Run
days
#74 of 95
Bottom Quartile
?
Longest recorded period of continuous operation between outages.
714
Record Run
days
#31 of 95
Mid Quartile
?
Breaker-to-Breaker runs — continuous operation exceeding the cycle-adjusted threshold (618 days for this 24-month cycle unit) with no trips to 0% power.
--
B2B Runs
?
Lifetime capacity factor: average power level across all recorded days (100% = always at full power). Ranked against all NRC-tracked units.
90.9%
Capacity Factor
#36 of 95
Mid Quartile
?
Net electricity actually generated over the most recent 12 months reported by the U.S. Energy Information Administration (Form EIA-923), summed across every unit at this plant. These are authoritative actuals, not an estimate.
13.91 TWh
Net Generation
EIA-923 · 12 mo to 2026-06 · plant total
?
Community rating score (Bayesian-adjusted). Based on 39 votes. Ranked against all rated facilities.
55.9
Rating
39 votes
#26 of 97
Mid Quartile
?
Total NRC-reported scram events (emergency reactor shutdowns). Ranked fleet-wide — fewer scrams = better rank.
5
Scrams
#26 of 94
Mid Quartile
?
Years since commercial operation began. License remaining: 11.8 years.
47
Operating Age
years
11.8 yrs remaining

Reactor Status Timeline

Online NRC data, Mon to Fri ? Actual daily reactor status from NRC reports (Mon to Fri) and the current state. What is coming -- the utility's published Scheduled outage and NukeWorker's model Projection -- is part of a subscription. Colored by status. How far ahead you can see depends on your plan.
Oct2025NovDecJan2026FebMarAprMayJunJulAugSepOnline: Sep 9, 2025 to Sep 13, 2025Scram: Sep 14, 2025 to Sep 17, 2025Reduced Power: Sep 18, 2025 to Sep 19, 2025Online: Sep 20, 2025Power Ascension: Sep 21, 2025Online: Sep 22, 2025 to Oct 9, 2025Reduced Power: Oct 10, 2025 to Oct 11, 2025Online: Oct 12, 2025 to Jan 6, 2026Reduced Power: Jan 7, 2026 to Jan 9, 2026Online: Jan 10, 2026 to Mar 22, 2026Reduced Power: Mar 23, 2026Online: Mar 24, 2026 to May 10, 2026Forced Outage: May 11, 2026 to May 15, 2026Reduced Power: May 16, 2026 to May 17, 2026Power Ascension: May 18, 2026 to May 20, 2026Online: May 21, 2026 to May 26, 2026Reduced Power: May 27, 2026Online: May 28, 2026Reduced Power: May 29, 2026Online: May 30, 2026 to Sep 9, 2026Scram (reactor trip): Sep 13, 2025Today
OnlineReduced PowerPower AscensionForced OutageScramScram (reactor trip)
Full history & analysis →

Operational Excellence Score Subscribers

Hatch 2 is rated 0 to 100 on how well it actually runs, scored against every other operating reactor in the US fleet from its own operating record. Subscribers see the score, the three sub-scores behind it, and each of the seven measured inputs.

  • This unit's composite score and fleet rank
  • Reliability, Efficiency and Discipline sub-scores
  • All seven measured inputs, with fleet percentiles
  • Rank against comparable units, not just the fleet
  • Three-year, five-year and lifetime windows
  • Five-year trend, and every other operating US reactor

Included with every outage subscription and with NukeWorker Gold membership. Trading the outage rather than working it? The same record, cut by power market, is on NukeGryd.

Capacity Factor (365-Day)

?
100%
Current
96%
365-Day Avg
#64
of 94 plants
Min: 0% Max: 100% 18 days <80%

Outage Duration Trend

?
Scheduled refueling outage durations over time. Green bars are below average, yellow near average, red above. Dashed line shows the plant's historical average. Shorter outages mean better execution.
Hatch 2 has completed 14 scheduled refueling outages on record, averaging 38 days each. The most recent, in Feb 2025, ran 34 days.

Power History (12-Month)

?
Daily power output as a percentage of rated capacity over the past 365 days. Green segments indicate full power (90%+), yellow shows reduced output, and red indicates significant power reductions or shutdowns.
Over the past 12 months Hatch 2 has run at an average of 96% of rated power. On the chart, green stretches are full-power running and dips toward zero mark reduced output or outages.

Outage Days by Year

?
Total days spent in outage each year, split by scheduled refueling (blue) and forced/unplanned (red). Lower totals indicate better reliability and outage execution. Hover for details.
Across its recorded history, Hatch 2 has spent 533 days in scheduled refueling outages and 152 days in forced or unplanned outages. Taller bars mark the years with the most downtime.

Facility Statistics

?
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
Hatch 2 has operated for about 47 years and averaged a 90.9% lifetime capacity factor, generating roughly 194.7 TWh of electricity. Its longest unbroken run reached 714 days.
Lifecycle & Tenure
Operating Age: 47 Yrs
Build Time: 6.7 Yrs
Lic. Remaining: 11.8 Yrs
Production & Power
Lifetime CF: 90.9%
Efficiency: 31.5%
Generated: 194.7 TWh
Reliability & Outages
Record Run: 714 Days
Refuelings: 14
Avg Startup: 10.1 Days

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
11036 Hatch Parkway North US Hwy1
Baxley, GA 31513, USA
Get Directions
Phone: (912) 367-7781

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from GSA for FY 2026.
$110
Lodging/Night
$68
M&IE/Day
$178
Total/Day
Standard Rate, GA

Unemployment Benefits GA

?
Maximum state unemployment insurance benefits for GA. Actual benefits depend on your earnings history and may be lower than the maximum. Data as of Jan 2026.
$365
Max Weekly
20
Max Weeks
$7,300
Max Total

Ownership & Construction

?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Owner/Operator: Southern Nuclear
Architect Engineer: BECH
Constructor: GPC
SO The Southern Company NYSE
$88.99 ▲ +0.88 (+1.00%)
Previous Close 88.11
Day's Range 88.10 – 89.34
52-Week Range 83.80 – 100.84
Volume 6,255,004
Delayed quote as of Sep 8, 2026 4:00 PM ET. Source: Yahoo Finance. Full quote on Yahoo Finance

Technical Specs

?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Reactor Type: BWR
Containment: BWR-MARK 1
NSS Supplier: GE 4
Thermal Power: 2804 MWt
Net Capacity: 883 MWe
Efficiency: 31.5%
Status: Operating

Licensing

?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #: 05000366
License #: NPF-5
License Type: OL-FP
Const. Permit: 1972-12-27
Operating Lic: 1978-06-13
Commercial Op: 1979-09-05
License Renewed: 2002-06-15
License Exp: 2038-06-13

Market & Region

?
EIA market and grid-region classifications: NERC reliability region, U.S. Census region, balancing authority responsible for grid operations, and whether the unit operates as a rate-regulated utility or a competitive merchant generator. Hover any value for the full name.
NERC Region: SERC — SERC Reliability Corporation
Census Region: SAT — South Atlantic
Balancing Authority: SOCO — Southern Company
Market Structure: Regulated — Rate-regulated utility (cost-of-service pricing)