Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
Active nuclear industry job listings in NY from the NukeWorker job board. Click a job title for full details, or click the header to search all jobs in this state.
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from GSA for FY 2027.
$168
Lodging/Night
$92
M&IE/Day
$260
Total/Day
Tarrytown / White Plains / New Rochelle, Westchester County, NY
Maximum state unemployment insurance benefits for NY. Actual benefits depend on your earnings history and may be lower than the maximum. Data as of Jan 2026.
Interactive satellite map showing the facility's geographic location. Marker color indicates current status: green for online, red for offline, orange for reduced power. Click the header to open in Google Maps satellite view.
41.2691, -73.9527
Location & Contact
?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Community ratings from NukeWorker members. Vote to share your experience working at this facility. Score uses a Bayesian average that accounts for vote count — facilities with few votes are pulled toward the fleet average, so rankings reflect confidence, not just raw percentages.
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Indian Point Energy Center.
Indian Point Energy Center is a three-reactor site at Buchanan, in Westchester County, New York, on the east bank of the Hudson River just south of Peekskill. It lies about 36 miles north of Midtown Manhattan.
Read more
Consolidated Edison began building Unit 1, a Babcock & Wilcox pressurized water reactor, on May 1, 1956. It connected to the grid in September 1962 and was shut down on October 31, 1974, because its emergency core cooling system did not meet requirements. Unit 2 (Westinghouse, construction started October 14, 1966) began operating in 1973 and was shut down in April 2020. Unit 3 (Westinghouse, built by the New York Power Authority, construction started November 1, 1968) began in 1976 and was shut down in April 2021.
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.