?
Current reactor power level from the most recent NRC daily report.
Shut Down
?
Days of continuous operation since the last outage ended. Ranked against all operating units.
1,656
Current Run
days
?
Longest recorded period of continuous operation between outages.
1,656
Record Run
days
?
Breaker-to-Breaker runs — continuous operation exceeding the cycle-adjusted threshold (513 days for this 24-month cycle unit) with no trips to 0% power.
3
B2B Runs
?
Lifetime capacity factor: average power level across all recorded days (100% = always at full power). Ranked against all NRC-tracked units.
91%
Capacity Factor
?
Community rating score (Bayesian-adjusted). Based on 24 votes. Ranked against all rated facilities.
58.3
Rating
24 votes
#19 of 97
Top Quartile
?
Total NRC-reported scram events (emergency reactor shutdowns). Ranked fleet-wide — fewer scrams = better rank.
10
Scrams
?
Years since commercial operation began.
44.7
Operating Age
years
Scram History 10 events since 2011
Automatic and manual reactor scram (emergency shutdown) events reported to the NRC since 2011. Includes event dates, trip type, and average recovery time. Click the title to view the full fleet scram dashboard.
Outage Duration Trend
?Scheduled refueling outage durations over time. Green bars are below average, yellow near average, red above. Dashed line shows the plant's historical average. Shorter outages mean better execution.
Outage Days by Year
?Total days spent in outage each year, split by scheduled refueling (blue) and forced/unplanned (red). Lower totals indicate better reliability and outage execution. Hover for details.
Facility Statistics
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
Lifecycle & Tenure
Operating Age: 44.7 Yrs
Build Time: 7 Yrs
Lic. Remaining: N/A Yrs
Production & Power
Lifetime CF: 91%
Efficiency: 32.6%
Generated: 178.5 TWh
Reliability & Outages
Record Run: 1,656 Days
Refuelings: 16
Ratings 24 votes
Community ratings from NukeWorker members. Vote to share your experience working at this facility. Score uses a Bayesian average that accounts for vote count — facilities with few votes are pulled toward the fleet average, so rankings reflect confidence, not just raw percentages.
Above Average
12 (50%)
Average
8 (33%)
Below Average
4 (16%)
Facility Map
Interactive satellite map showing the facility's geographic location. Marker color indicates current status: green for online, red for offline, orange for reduced power. Click the header to open in Google Maps satellite view.
41.2691, -73.9527
Location & Contact
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Phone:
(914) 736-8000
Website:
http://www.entergy-nuclear.com/
Per Diem Rates FY 2026
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from GSA for FY 2026.
$161
Lodging/Night
$92
M&IE/Day
$253
Total/Day
Tarrytown / White Plains / New Rochelle, Westchester County, NY
Jobs in NY 39 active
Active nuclear industry job listings in NY from the NukeWorker job board. Click a job title for full details, or click the header to search all jobs in this state.
Photos
Photos of this facility from the NukeWorker photo gallery. Click the header or any photo to browse the full album.
Breaker-to-Breaker Runs 3 runs
Breaker-to-breaker runs measure continuous operation between refueling outages using a cycle-adjusted threshold (90% of cycle length minus RFO duration). An active streak means the unit has been running continuously since the last refueling with no trips to 0% power.
753
Best Run (days)
2019-04-09 → 2021-05-01
668
Avg Run (days)
All Runs
| 2019-04-09 | 2021-05-01 | 753 days |
| 2007-04-28 | 2009-03-11 | 683 days |
| 2003-08-22 | 2005-03-12 | 568 days |
Ownership & Construction
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Technical Specs
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Reactor Type:
PWR
Containment:
PWR-DRYAMB
NSS Supplier:
WEST 4LP
Thermal Power:
3025 MWt
Net Capacity:
985 MWe
Efficiency:
32.6%
Status:
Decommissioned
Licensing
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #:
05000286
License #:
DPR-64
License Type:
OL-FP
Const. Permit:
1969-08-13
Operating Lic:
1976-04-05
Commercial Op:
1976-08-30
License Exp:
2015-12-15
